Determination

The table below lists all marine licence applications, projects and documentation submitted to Marine Scotland Information and associated with the Determination term.
MSLOT application type Date of application (if applicable) Licence commencement date (as granted) (if applicable)
Consultation Responses - Pentland Floating Offshore Wind Farm - Dounreay, Caithness - 00010577, 00010578 & Section 36 Consent Renewables - Wind
Consultation Responses - Pentland Floating Offshore Wind Farm - Dounreay, Caithness - 00009991, 00009992 & Section 36 Consent Renewables - Wind
Safety Zones Notice - Moray West Offshore Wind Farm, Moray Firth Renewables - Wind
Request to Extend Commencement of the Development - Submission to Ministers - Inch Cape Offshore Windfarm (Revised Design) Renewables - Wind
Public Notice of Decision - Pentland Floating Offshore Wind Farm - Dounreay, Caithness Renewables - Wind
Appropriate Assessment - Pentland Floating Offshore Wind Farm - Dounreay, Caithness Renewables - Wind
Marine Licence - Re-burying and Anchoring of Exposed Sub-Sea Pipe - Luskentyre Beach, Isle of Harris - 00010216 Cable
2023 Section 36 consent variation - Submission to Ministers - Inch Cape Offshore Windfarm (Revised Design) Renewables - Wind
2023 Section 36 consent and generating station marine licence variation - Consultation Responses - Inch Cape Offshore Windfarm (Revised Design), Firth of Forth Renewables - Wind
2023 Section 36 consent and generating station marine licence variation - Appropriate Assessment Validation - Inch Cape Offshore Windfarm (Revised Design), Firth of Forth Renewables - Wind
Piling Strategy and Decision Notice - Moray West Offshore Windfarm, Moray Firth Renewables - Wind
European Protected Species Variation Licence - UXO Clearance Activities – Moray West Offshore Windfarm, Moray Firth – 00010265 Renewables - Wind
Pentland Floating Offshore Wind Farm - Section 36 Consent Variation - Submission to Ministers Renewables - Wind
Marine Licence - Mocean Energy East of Deerness, Orkney - Consultation Responses - 00008757 Renewables - Wave
Decision Letter - Acoustic Deterrent Device - Clashnessie Bay- 00010080 Other
Validation of Appropriate Assessment - Section 36 Consent Variation - Fall of Warness Tidal Test Site, EMEC Renewables - Tidal
Submission to Ministers - Section 36 Consent Variation - Fall of Warness Tidal Test Site, EMEC Renewables - Tidal
Public Notice of Decision - Forthwind Offshore Wind Demonstration Project - Methil, Firth of Forth Renewables - Wind
Appropriate Assessment - Forthwind Offshore Wind Demonstration Project - Methil, Firth of Forth Renewables - Wind
Dounreay Trì Floating Wind Demonstration Project – Consent Condition Variation Submission to Ministers Renewables - Wind
Dounreay Trì Floating Wind Demonstration Project - Consent Condition Variation Approval Letter Renewables - Wind
Safety Zones - Moray West Offshore Windfarm, Moray Firth Renewables - Wind 2022-12-19
Marine Licence - Inch Cape Offshore Windfarm (Revised Design), Firth of Forth - Additional Landfall Works - 00010672 Renewables - Wind 2023-01-26 2025-01-01
Consultation Responses - Outer Berth Construction, Capital Dredge and Sea Deposit - Port Of Leith - 00009818 & 00009819 Construction, alteration or improvement of any works
Appropriate Assessment - Outer Berth Redevelopment - Port Of Leith - 00009818, 00009819, 00009909 Construction, alteration or improvement of any works
EMEC - Billia Croo - Section 36 consent - Ministerial submission Renewables - Wind
Seagreen Alpha and Bravo Wind Farm - Section 36 Consent Variation - Submission to Ministers Renewables - Wind
Seagreen Alpha and Bravo Wind Farm - Section 36 Consent Variation - Submission to Ministers Renewables - Wind
European Protected Species Licence - Acoustic Deterrent Device - Clashnessie Bay- 00010080 Other 2022-10-07
Decision Notice - Harbour Development - Staffin, Skye - 00009582 Construction, alteration or improvement of any works
Consultation Responses - Harbour Development - Staffin, Skye - 00009582 Construction, alteration or improvement of any works
Appropriate Assessment Validation - Section 36 Consent Variation - Seagreen Alpha and Bravo Wind Farms, Firth of Forth Renewables - Wind
Section 36 Consent Variation Determination - Consultation Responses - Seagreen Alpha and Bravo Wind Farm, Firth of Forth Renewables - Wind
Section 36 Variation - Submission to Minister - Moray West Offshore Wind Farm Renewables - Wind
Appropriate Assessment – Marine Licence - Construction of new Harbour with use of Explosive Substances and Capital Dredging and Sea Deposit- Nigg Bay, Aberdeen - 07161/07035 Construction, alteration or improvement of any works
Notice of Decision – Construction of Export Cable – Seagreen 1A Export Cable Corridor, Firth of Forth - 00009291 Cable
Appropriate Assessment – Construction of Export Cable – Seagreen 1A Export Cable Corridor, Firth of Forth - 00009291 Cable
Notice of a Proposal to Modify Safety Zone Notices - Seagreen Alpha and Bravo Offshore Wind Farm Area Renewables - Wind
Moray West Section 36 Variation - Consultation responses Renewables - Wind
Decision Notice – Construction of Export Cable – Seagreen 1A Export Cable Corridor, Firth of Forth - 00009291 Renewables - Wind
Safety Zone Notice (Offshore Substation Platforms) - Seagreen Alpha and Bravo Offshore Wind Farm Area, Firth of Forth Renewables - Wind
Safety Zone Notice (Wind Turbine Generators) - Seagreen Alpha and Bravo Offshore Wind Farm Area, Firth of Forth Renewables - Wind
Marine Licence - Pontoon - Torgawn, Loch a Chairn Bhain - 00009410 Pontoon 2021-07-14 2022-02-19
Additional Information Consultation Responses- Deep Water Quay construction - Stornoway, Isle Of Lewis - 00008748/0008749 Construction, alteration or improvement of any works
Consultation Responses- Deep Water Quay construction - Stornoway, Isle Of Lewis - 00008748/0008749 Construction, alteration or improvement of any works
Decision Notice- Deep Water Port, Glumaig Bay, Stornoway- 00008478/00008479 Construction, alteration or improvement of any works
Submission to Ministers July 2021 - Construction and Operation of Offshore Windfarm and Transmission Works - Inch Cape Offshore Windfarm (Revised Design), Firth of Forth Renewables - Wind
Consultation Responses - Mocean Energy - Wave Energy Converter - Billia Croo, EMEC, Orkney - 00009188 Renewables - Wave
Safety Zone Approval Letter - Kincardine Offshore Windfarm Renewables - Wind
Decision Notice - Construction - Nigg Energy Park East Quay - 07069/00009032 Construction of new works
EPS Licence - Geophysical Surveys - Aberdeen Bay - EPS-00009123 Renewables - Wind
Safety Zone - Ministerial Submission - Moray East Offshore Wind Farm, Outer Moray Firth Renewables - Wind
Marine Licence - Maintenance Dredge – Stonehaven Harbour – 00008915 Dredging 2020-08-20 2021-06-03
Notice Served of a Proposal for a Safety Zone - Moray East Offshore Windfarm, Outer Moray Firth Renewables - Wind
Safety Zone - Ministerial Submission - Neart na Gaoithe Offshore Wind Farm (Revised Design) Renewables - Wind
Appropriate Assessment - Nigg Energy Park East Quay Construction of new works
Submission to Minister - Construction and Operation of Offshore Windfarm and Transmission Works - Inch Cape Offshore Windfarm (Revised Design), Firth of Forth Renewables - Wind
Consultation Responses - Capital Dredging and Sea Deposit - Nigg Bay, Aberdeen - 07035 Dredging
Consultation Responses - Construction of new harbour and use of explosive substances - Nigg Bay Aberdeen - 07161 Construction, alteration or improvement of any works
Decision Notice - Uig Harbour Redevelopment Construction of new works
Publication of proposal for a Safety Zone in terms that are materially different from those applied for - Neart na Gaoithe Offshore Wind Farm (Revised Design) Renewables - Wind
Consultation Responses - Construction and Operation of Offshore Windfarm and Transmission Works - Inch Cape Offshore Windfarm (Revised Design), Firth of Forth Renewables - Wind
Consultation Responses - New Mooring - Deer Sound, Orkney - 07168 Mooring
Decision Notice - Scrabster Harbour Redevelopment- St.Ola Pier, Scrabster Harbour, Thurso- 07075/07076 Construction, alteration or improvement of any works
Appropriate Assessment - Scrabster Harbour Redevelopment- St.Ola Pier, Scrabster Harbour, Thurso- 07075/07076 Construction, alteration or improvement of any works
Safety Zone - Construction and Major Maintenance - Neart na Gaoithe Offshore Wind Farm (Revised Design) Other 2020-01-17
Submission to Ministers - Section 36 Consent Extension of the European Offshore Wind Deployment Centre - Aberdeen Bay Renewables - Wind
Appropriate Assessment Validation - Section 36 Consent Extension of the European Offshore Wind Deployment Centre - Aberdeen Bay Renewables - Wind
Addendum - Construction and operation of generating station – Levenmouth Demonstration Turbine Area, Firth of Forth Renewables - Wind
Consultation Responses (2012) - MacColl, Telford and Stevenson Offshore Wind Farms, Moray East Offshore Wind Farm Renewables - Wind
Environmental Statement Addendum Consultation Responses - Construction & Operation of Generating Station and Transmission Works - Beatrice Offshore Wind Farm, Moray Firth Renewables - Wind
Environmental Statement Consultation Responses - Construction & Operation of Generating Station and Transmission Works - Beatrice Offshore Wind Farm, Moray Firth Renewables - Wind
Commencement Phase 1(b) Decision Notice - MeyGen Tidal Energy Project - Inner Sound, Pentland Firth Renewables - Tidal
Submission to Ministers – Seagreen Alpha and Bravo Offshore Wind Farms, Firth of Forth Renewables - Wind
Decision Notice – Construction and operation of generating station, Seagreen Alpha and Seagreen Bravo Offshore Wind Farms, Firth of Forth – 04677 Renewables - Wind
Section 36 Consent – Construction and operation of wind farm, Seagreen Alpha and Bravo Wind Farm Area, Firth of Forth Renewables - Wind 2012-10-15
Submission to Ministers - Seagreen Alpha and Bravo Offshore Wind Farms Renewables - Wind
Submission to Ministers - Section 36 (Variation) Application - MacColl, Stevenson and Telford Offshore Wind Farms, Moray East Offshore Wind Farm Renewables - Wind
Consent Decision - Environmental Impact Assessment - Modified Offshore Transmission Infrastructure - Moray East Offshore Wind Farm - 05340 Renewables - Wind
Appropriate Assessment - Modified Offshore Infrastructure - Moray East Offshore Wind Farm - 05340 Renewables - Wind
Submission to Ministers- Construction and Operation of Stevenson Offshore Wind Farm, Moray East Offshore Wind Farm - Moray East Offshore Wind Farm, Outer Moray Firth Renewables - Wind
Submission to Ministers - Construction and Operation of MacColl Offshore Wind Farm, Moray East Offshore Wind Farm,Outer Moray Firth Renewables - Wind
Environmental Impact Assessment Consent Decision- Construction and Operation of Moray East Offshore Wind Farm Renewables - Wind
Appropriate Assessment - Moray East Offshore Wind Farm Renewables - Wind
Appropriate Assessment - Construction and Operation of Offshore Generating Station - Moray East Offshore Wind Farm Renewables - Wind
Consultation Responses - Deployment of three wave measurement buoys - Beatrice Offshore Wind Farm, Moray Firth Renewables - Wind
Combined Responses - Neart na Gaoithe Renewables - Wind
Appropriate Assessment - Neart na Gaoithe Renewables - Wind
Consultation Responses Variation - Construction and Operation of Offshore Wind farm - Neart na Gaoithe, Firth of Forth Renewables - Wind
Submission to Ministers Variation - Construction and Operation of Offshore Wind farm - Neart na Gaoithe, Firth of Forth Renewables - Wind
Appropriate Assessment - Construction and Operation of Offshore Wind farm - Neart na Gaoithe, Firth of Forth Renewables - Wind
Consultation responses - Shetland Tidal Array (as extended) – Bluemull Sound, Shetland – 06642 Renewables - Tidal
Appropriate Assessment - Shetland Tidal Array (as extended) – Bluemull Sound, Shetland – 06642 Renewables - Tidal
Submission to Ministers - Construction and Operation of Offshore Wind farm – Neart na Gaoithe, Firth of Forth Renewables - Wind
Appropriate Assessment - Deposits Tidal Array – Bluemull Sound, Shetland – 04859 Renewables - Tidal
Consultation Responses - Seabed Preparation at MeyGen Tidal Energy Project - Inner Sound, Pentland Firth - 06045 Renewables - Tidal
Submission to Ministers - MeyGen Tidal Energy Project - Inner Sound, Pentland Firth Renewables - Tidal
Appropriate Assessment - MeyGen Tidal Energy Project - Inner Sound, Pentland Firth Renewables - Tidal
EIA Consent Decision - MeyGen Tidal Energy Project - Inner Sound, Pentland Firth - 04577 Renewables - Tidal
Consultation Responses for Marine Licence Variation Application - MeyGen Tidal Energy Project - Inner Sound, Pentland Firth - 04577 Renewables - Tidal
EIA Consent Decision - MeyGen Tidal Energy Project - Inner Sound, Pentland Firth - 04577 Renewables - Tidal
Consultation Responses - MeyGen Tidal Energy Project - Inner Sound, Pentland Firth - 06182 Renewables - Tidal
Consultation Responses - MeyGen Tidal Energy Project - Inner Sound, Pentland Firth Renewables - Tidal
06953 - GIS Chart Dredging
Lochmaddy - 07000/07001 - Appropriate Assessment Construction, alteration or improvement of any works
Lochmaddy - 07000/07001 - Marine Protected Area Assessment Construction, alteration or improvement of any works
Dounreay Trì Floating Wind Demonstration Project - Public Representation Renewables - Wind
Dounreay Trì Floating Wind Demonstration Project - Consultation Responses Renewables - Wind
Dounreay Trì Floating Wind Demonstration Project - Consultation Responses Renewables - Wind
Dounreay Trì Floating Wind Demonstration Project - EIA Consent Decision Renewables - Wind
Dounreay Trì Floating Wind Demonstration Project - Appropriate Assessment Renewables - Wind
Dounreay Trì Floating Wind Demonstration Project - Submission to Ministers Renewables - Wind
Decision Notice - Ardersier Port Development Construction, alteration or improvement of any works
Consultation Responses - Ardersier Port Development Construction, alteration or improvement of any works
Appropriate Assessment - Ardersier Port Development Construction, alteration or improvement of any works
06907/06908 - Appropriate Assessment Construction of new works
MeyGen Tidal Energy Project - Section 36 Consent Variation - Appropriate Assessment Validation Renewables - Tidal
06812 - Refusal Letter Construction of new works
MeyGen Tidal Energy Project - Section 36 Consent Variation - Submission to Ministers Renewables - Tidal
06977 - Licence Fish (including shellfish) farm
06812- Houseboat- Loch Kishorn Construction, alteration or improvement of any works 2018-10-03
Levenmouth Demonstration Turbine - s.36 variation - Appropriate Assessment Renewables - Wind
Inch Cape Offshore Windfarm (Revised Design) - Decision - Public Notice Renewables - Wind
Moray West Offshore Wind farm - Submission to Ministers Renewables - Wind
Inch Cape Offshore Windfarm (Revised Design) - Submission to Ministers Renewables - Wind
Inch Cape Offshore Windfarm (Revised Design) – Appropriate Assessment 2019 Renewables - Wind
Moray West Offshore Windfarm - Marine Protected Area ("MPA") Assessement Renewables - Wind
Moray West Offshore Wind Farm - Wind farm and Transmission Works Appropriate Assessement Renewables - Wind
Neart na Gaoithe Offshore Windfarm (Revised Design) - Section 36 Consent Variation - Appropriate Assessment Validation Renewables - Wind
Neart na Gaoithe Offshore Windfarm (Revised Design) - Section 36 Consent Variation - Submission to Ministers Renewables - Wind
Forthwind Offshore Development Phase 1 - Section 36 Variation - Submission to Ministers Renewables - Wind
European Offshore Wind Deployment Centre – Section 36 Consent Variation – Consultation responses Renewables - Wind
Neart na Gaoithe Offshore Windfarm (Revised Design) - Section 36 Consent Variation - Consultation Responses Renewables - Wind
06473/06474 – West of Scotland Archaeology Service Consultation Response Construction of new works
06473/06474 – Scottish Water Consultation Response Construction of new works
06473/06474 – SNH Consultation Response Construction of new works
06473/06474 – SEPA consultation Response Construction of new works
06473/06474 - SEPA Consulatation Response Construction of new works
06473/06474 - RYA Consultation Response Construction of new works
06473/06474 - NLB Consultation Response Construction of new works
06473/06474 – MCA Consultation Response Construction of new works
06473/06474 - HES Consultation Response Construction of new works
06473/06474 - Glasgow Airport Consultation Reponse Construction of new works
Moray East Offshore Windfarm - Safety Zone - Ministerial Submission Renewables - Wind
Forthwind Offshore Development Phase 1 - Section 36 Variation - Consultation Responses Renewables - Wind
Inch Cape Offshore Windfarm - Section 36 Consent (2014) Renewables - Wind
Inch Cape Offshore Windfarm - EIA Consent Decision (2014) Renewables - Wind
06806/06807 - Consultation Responses Construction, alteration or improvement of any works
06806/06807 - Decision Notice Construction, alteration or improvement of any works
06806/06807 - Appropriate Assessment Construction, alteration or improvement of any works
Moray East Offshore Windfarm - UXO Clearance - Appropriate Assessment Renewables - Wind
Inch Cape Offshore Windfarm - Submission to Ministers Renewables - Wind
Inch Cape Offshore Windfarm - Development Location Renewables - Wind
Inch Cape Offshore Windfarm - Appropriate Assessment Renewables - Wind
Inch Cape Offshore Windfarm - Environmental Impact Assessment Consent Decision Renewables - Wind
Inch Cape Offshore Windfarm - Section 36A Declaration Renewables - Wind
Inch Cape Offshore Windfarm - Decision Notice and Conditions Renewables - Wind
NorthConnect HVDC Cable – 06771 – Appropriate Assessment Cable
Construction, Operation and Deposit of a Tidal Energy Device - 06818 - Consultation Responses Renewables - Tidal
Kilfinichen Pier Development, Isle of Mull - Notice of Decision Construction of new works
Kilfinichen Pier Development, Isle of Mull - Decision Notice Construction of new works
Kilfinichen Pier Development, Isle of Mull - Consultation Responses Construction of new works
Neart na Gaoithe Offshore Windfarm (Revised Design) - Decision - Public Notice Renewables - Wind
06809 - EPS Letter Cable
Neart na Gaoithe Offshore Windfarm (Revised Design) - Submission to Ministers Renewables - Wind
Neart na Gaoithe Offshore Windfarm (Revised Design) - Appropriate Assessment 2018 Renewables - Wind
Levenmouth Demonstration Turbine - Section 36 Consent Variation - Public Notice Renewables - Wind
Neart na Gaoithe Offshore Windfarm (Revised Design) - Information to inform the Appropriate Assessment Renewables - Wind
Inch Cape Offshore Windfarm (Revised Design) - Consultation Responses Renewables - Wind
EMEC Fall of Warness - Appropriate Assessment Renewables - Tidal
Kincardine Offshore Windfarm - s.36 Variation - Submission to Ministers Renewables - Wind
Port of Cromarty Firth - Phase 4 - Appropriate Assessment
Port of Cromarty Firth - Phase 4 - Decision Notice
Levenmouth Demonstration Turbine - Submission to Ministers Renewables - Wind
Levenmouth Demonstration Turbine - Decision Notice - Marine Licence Renewables - Wind
Seagreen - Section 36 Capacity Variation Submission to Ministers Renewables - Wind
Kincardine Offshore Windfarm - 06312/17/0 - Consultation Responses Renewables - Wind
Kincardine Offshore Windfarm - Consultation Responses Renewables - Wind
Kincardine Offshore Windfarm - Appropriate Assessment Renewables - Wind
Kincardine Offshore Windfarm - Section 36 consent - Submission to Ministers Renewables - Wind
Kincardine Offshore Windfarm - 05914/17/0 - EIA Consent Decision Renewables - Wind
Kincardine Offshore Windfarm - Section 36 consent variation - Consultation Responses Renewables - Wind
Kincardine Offshore Windfarm - Section 36 consent variation - Submission to Ministers Renewables - Wind
Beatrice Offshore Wind Farm - 06145 - Consultation Responses Removal of any substance or object
Beatrice Offshore Wind Farm - Nearshore Survey - European Protected Species Licence Determination Renewables - Wind
Beatrice Offshore Wind Farm - MS EPS 01/2016/00 - Consultation Responses Renewables - Wind
Beatrice Offshore Wind Farm - Appropriate Assessment Renewables - Wind
Beatrice Offshore Wind Farm - Submission to Ministers Renewables - Wind
Beatrice Offshore Wind Farm - Environmental Impact Assessment Consent Decision Renewables - Wind
Beatrice Offshore Wind Farm - 06302 - Consultation Responses Cable
Sediment Sampling - 06738 - Appropriate Assessment Removal of any substance or object
Hywind (Scotland) Limited - Unexploded Ordanance (UXO) Clearance - European Protected Species - Consultee Response Renewables - Wind
European Offshore Wind Deployment Centre - Safety Zone - Ministerial Submission Renewables - Wind
European Offshore Wind Deployment Centre - 06359/17/0 - Consultation Responses Renewables - Wind
European Offshore Wind Deployment Centre - 06226/17/0 - Consultation Responses Renewables - Wind
European Offshore Wind Deployment Centre - 06051/16/0 - Consultation Responses Renewables - Wind
European Offshore Wind Deployment Centre - 06066/16/0 - Consultation Responses Renewables - Wind
European Offshore Wind Deployment Centre - Geotechnical Survey - March 2018 Renewables - Wind
European Offshore Wind Deployment Centre - Geotechnical Survey - August 2016 Renewables - Wind
European Offshore Wind Deployment Centre - Geotechnical Survey - June 2016 Renewables - Wind
European Offshore Wind Deployment Centre - Geotechnical Survey - April 2016 Renewables - Wind
European Offshore Wind Deployment Centre - 06573/17/0 - Consultation responses Removal of any substance or object
Aberdeen Harbour Expansion - Appropriate Assessment Construction of new works
Hywind Scotland Pilot Park - Unexploded Ordance (UXO) Clearance - Consultee Responses Renewables - Wind
Hywind Scotland Pilot Park - European Protected Species Geophysical Survey Consultee Response Renewables - Wind
Hywind Scotland Pilot Park - 06294/17/0 - Consultee Responses Renewables - Wind
Hywind Scotland Pilot Park - 06416/17/0 - Consultee Responses Renewables - Wind
Hywind Scotland Pilot Park - 05515/15/0 - Decision Notice Renewables - Wind
Hywind Scotland Pilot Park - 05515/15/0 - Submission to Ministers Renewables - Wind
Hywind Scotland Pilot Park - 05515/15/0 - Environmental Impact Assessment Consent Decision Renewables - Wind
Hywind Scotland Pilot Project - 05515/15/0 - Appropriate Assessment Renewables - Wind
Hywind Scotland Pilot Park - JNCC & SNH Consultee Responses Renewables - Wind
Hywind Scotland Pilot Park - Consultee Responses Renewables - Wind
European Offshore Wind Deployment Centre - 04309/16/00 - Consultation notifications Renewables - Wind
European Offshore Wind Deployment Centre - 04309/16/00 - Consultee responses Renewables - Wind
Hywind Scotland Pilot Park - Public Notice of Licence Granted Renewables - Wind
European Offshore Wind Deployment Centre - Environmental Impact Assessment consent decision Renewables - Wind
European Offshore Wind Deployment Centre - Appropriate Assessment Renewables - Wind
European Offshore Wind Deployment Centre - Submission to Ministers Renewables - Wind
West Islay Tidal Energy Park Submission to Ministers 23 March 2017 Renewables - Tidal
West Islay Tidal Energy Park public notice of decision August 2017 Renewables - Tidal
West Islay Tidal Energy Park EIA Consent Decision Renewables - Tidal
West Islay Tidal Energy Park Development Location Renewables - Tidal
West Islay Tidal Energy Park Appropriate Assessment Renewables - Tidal
West Islay Tidal Energy Park decision letter and conditions Renewables - Tidal
Subscribe to RSS - Determination