{"vid":"117336","uid":"30648","title":"Neart na Gaoithe Offshore Windfarm (Revised Design) - Section 36 Consent Variation - Decision Notice","log":"Edited by RebeccaB.","status":"1","comment":"0","promote":"0","sticky":"0","ds_switch":"","nid":"17797","type":"data_source","language":"und","created":"1559565915","changed":"1559655246","tnid":"0","translate":"0","revision_timestamp":"1559655246","revision_uid":"0","body":{"und":[{"value":"<p>Varied section 36 consent issued in respect of the Neart na Gaoithe Offshore Windfarm</p>\r\n\r\n<p>The variation application sought to amend Annex 1 and Annex 2 of the s.36 consent granted on&nbsp;3 December 2018&nbsp;to allow the following variations :</p>\r\n\r\n<ul>\r\n\t<li>The removal of references to the Offshore Substation Platforms (\u201cOSPs\u201d), interconnector cables, and Offshore Export Cables (\u201cOEC\u201d) from the Description of the Development in Annex 1 and from conditions 12 and 22 of Annex 2;</li>\r\n\t<li>Amendment of minimum blade tip clearance in Annex 1 from 35 metres to 36 metres (measured from Lowest Astronomical Tide (\u201cLAT\u201d)); and</li>\r\n\t<li>Amendment of blade width in Annex 1 from 4.5 metres to 5.5 metres</li>\r\n</ul>\r\n","summary":"","format":"filtered_html","safe_value":"<p>Varied section 36 consent issued in respect of the Neart na Gaoithe Offshore Windfarm</p>\n<p>The variation application sought to amend Annex 1 and Annex 2 of the s.36 consent granted on\u00a03 December 2018\u00a0to allow the following variations :</p>\n<ul>\n<li>The removal of references to the Offshore Substation Platforms (\u201cOSPs\u201d), interconnector cables, and Offshore Export Cables (\u201cOEC\u201d) from the Description of the Development in Annex 1 and from conditions 12 and 22 of Annex 2;</li>\n<li>Amendment of minimum blade tip clearance in Annex 1 from 35 metres to 36 metres (measured from Lowest Astronomical Tide (\u201cLAT\u201d)); and</li>\n<li>Amendment of blade width in Annex 1 from 4.5 metres to 5.5 metres</li>\n</ul>\n","safe_summary":""}]},"field_type":{"und":[{"tid":"1871"}]},"field_datasource_link":[],"field_citation":[],"field_reference":[],"field_map_type_tag":[],"field_datasource_keywords":[],"field_tags":[],"field_manual_data_tag":[],"field_data_owner":[],"field_document":{"und":[{"fid":"92089","uid":"30648","filename":"Decision Notice","uri":"public://nng_-_s.36_variation_-_decision_notice_track_changes_redacted.pdf","filemime":"application/pdf","filesize":"690348","status":"1","timestamp":"1559635222","type":"document","_drafty_revision_requested":"FIELD_LOAD_CURRENT","rdf_mapping":[],"path":{"pathauto":"1"},"title":"","alt":"","metadata":[],"display":"1","description":""}]},"field_mslot_stage":{"und":[{"tid":"1866"}]},"field_mslot_application_type":{"und":[{"tid":"1843"}]},"field_mslot_other_document_categ":{"und":[{"tid":"1911"}]},"field_date_submitted":{"und":[{"value":"2019-06-04 00:00:00","timezone":"Europe/London","timezone_db":"Europe/London","date_type":"datetime"}]},"field_mslot_ag_categories":[],"field_cfwg_category":[],"field_transfer_and_delegation_do":[],"rdf_mapping":{"rdftype":["sioc:Item","foaf:Document"],"title":{"predicates":["dc:title"],"type":"property"},"created":{"predicates":["dc:date","dc:created"],"datatype":"xsd:dateTime","callback":"date_iso8601"},"changed":{"predicates":["dc:modified"],"datatype":"xsd:dateTime","callback":"date_iso8601"},"body":{"predicates":["content:encoded"],"type":"property"},"uid":{"predicates":["sioc:has_creator"],"type":"rel"},"name":{"predicates":["foaf:name"]},"comment_count":{"predicates":["sioc:num_replies"],"datatype":"xsd:integer"},"last_activity":{"predicates":["sioc:last_activity_date"],"datatype":"xsd:dateTime","callback":"date_iso8601"}},"path":"https://marine.gov.scot/?q=data/neart-na-gaoithe-offshore-windfarm-revised-design-section-36-consent-variation-decision-notice","name":"RebeccaB","picture":"0","data":"a:5:{s:16:\"ckeditor_default\";s:1:\"t\";s:20:\"ckeditor_show_toggle\";s:1:\"t\";s:14:\"ckeditor_width\";s:4:\"100%\";s:13:\"ckeditor_lang\";s:2:\"en\";s:18:\"ckeditor_auto_lang\";s:1:\"t\";}","workbench_moderation":{"current":{"hid":"108467","vid":"117336","nid":"17797","from_state":"needs_review","state":"published","uid":"23681","stamp":"1559655246","published":"1","is_current":1,"title":"Neart na Gaoithe Offshore Windfarm (Revised Design) - Section 36 Consent Variation - Decision Notice","timestamp":"1559655246"},"published":{"hid":"108467","vid":"117336","nid":"17797","from_state":"needs_review","state":"published","uid":"23681","stamp":"1559655246","published":"1","is_current":1,"title":"Neart na Gaoithe Offshore Windfarm (Revised Design) - Section 36 Consent Variation - Decision Notice","timestamp":"1559655246"},"my_revision":{"hid":"108467","vid":"117336","nid":"17797","from_state":"needs_review","state":"published","uid":"23681","stamp":"1559655246","published":"1","is_current":1,"title":"Neart na Gaoithe Offshore Windfarm (Revised Design) - Section 36 Consent Variation - Decision Notice","timestamp":"1559655246"}}}