{"vid":"152299","uid":"41927","title":"Construction Programme and Construction Method Statement - Neart na Gaoithe Offshore Wind Farm (Revised Design)","log":"Edited by LauraG.","status":"1","comment":"0","promote":"0","sticky":"0","ds_switch":"","nid":"20029","type":"data_source","language":"und","created":"1589881631","changed":"1762348896","tnid":"0","translate":"0","revision_timestamp":"1762348896","revision_uid":"41927","body":[],"field_type":{"und":[{"tid":"1871"}]},"field_datasource_link":[],"field_citation":[],"field_reference":[],"field_map_type_tag":[],"field_datasource_keywords":[],"field_tags":[],"field_manual_data_tag":[],"field_data_owner":[],"field_document":{"und":[{"fid":"171930","uid":"41927","filename":"Construction Programme and Construction Method Statement - 9 December 2019","uri":"public://cop_and_cms_plan_redacted.pdf","filemime":"application/pdf","filesize":"1897975","status":"1","timestamp":"1597316218","type":"document","_drafty_revision_requested":"FIELD_LOAD_CURRENT","rdf_mapping":[],"path":{"pathauto":"1"},"title":"","alt":"","metadata":[],"display":"1","description":""},{"fid":"171273","uid":"41927","filename":"Decision Notice - 14 May 2020","uri":"public://decision_notice_-_multi-stage_-_neart_na_gaoithe_-_cop_and_cms.pdf","filemime":"application/pdf","filesize":"302818","status":"1","timestamp":"1597316231","type":"document","_drafty_revision_requested":"FIELD_LOAD_CURRENT","rdf_mapping":[],"path":{"pathauto":"1"},"title":"","alt":"","metadata":[],"display":"1","description":""},{"fid":"205836","uid":"138235","filename":"Neart Na Gaoithe Offshore Wind Farm (Revised Design)-Construction Programme (CP) and Construction Method Statement (CMS)-Consultation Responses - September 2019","uri":"public://neart_na_gaoithe_offshore_wind_farm_revised_design_-_construction_programme_cp_and_construction_method_statement_cms_-_collated_responses_redacted.pdf","filemime":"application/pdf","filesize":"562440","status":"1","timestamp":"1762345311","type":"document","_drafty_revision_requested":"FIELD_LOAD_CURRENT","rdf_mapping":[],"path":{"pathauto":"0"},"title":"","alt":"","metadata":[],"display":"1","description":""},{"fid":"279653","uid":"152684","filename":"Construction Programme and Construction Method Statement \u2013 August 2025","uri":"public://construction_method_statement_and_construction_programme_rev11.0_clean.pdf","filemime":"application/pdf","filesize":"1709367","status":"1","timestamp":"1762341564","type":"document","_drafty_revision_requested":"FIELD_LOAD_CURRENT","rdf_mapping":[],"path":{"pathauto":"0"},"title":"","alt":"","metadata":[],"display":"1","description":""},{"fid":"279654","uid":"152684","filename":"Approval Letter \u2013 October 2025","uri":"public://neart_na_gaoithe_-_00009831_00006677_s.36_consent_-_revised_post_consent_plan_-_cap_cop_cms_ds_and_emp_-_approval_letter_october_2025_1.pdf","filemime":"application/pdf","filesize":"209997","status":"1","timestamp":"1762341564","type":"document","_drafty_revision_requested":"FIELD_LOAD_CURRENT","rdf_mapping":[],"path":{"pathauto":"0"},"title":"","alt":"","metadata":[],"display":"1","description":""}]},"field_mslot_stage":{"und":[{"tid":"1870"}]},"field_mslot_application_type":{"und":[{"tid":"1843"}]},"field_mslot_other_document_categ":{"und":[{"tid":"1896"}]},"field_date_submitted":{"und":[{"value":"2025-10-31 00:00:00","timezone":"Europe/London","timezone_db":"Europe/London","date_type":"datetime"}]},"field_mslot_ag_categories":[],"field_cfwg_category":[],"field_transfer_and_delegation_do":[],"rdf_mapping":{"rdftype":["sioc:Item","foaf:Document"],"title":{"predicates":["dc:title"],"type":"property"},"created":{"predicates":["dc:date","dc:created"],"datatype":"xsd:dateTime","callback":"date_iso8601"},"changed":{"predicates":["dc:modified"],"datatype":"xsd:dateTime","callback":"date_iso8601"},"body":{"predicates":["content:encoded"],"type":"property"},"uid":{"predicates":["sioc:has_creator"],"type":"rel"},"name":{"predicates":["foaf:name"]},"comment_count":{"predicates":["sioc:num_replies"],"datatype":"xsd:integer"},"last_activity":{"predicates":["sioc:last_activity_date"],"datatype":"xsd:dateTime","callback":"date_iso8601"}},"path":"https://marine.gov.scot/?q=data/construction-programme-and-construction-method-statement-neart-na-gaoithe-offshore-wind-farm","name":"MarcM","picture":"0","data":"a:5:{s:16:\"ckeditor_default\";s:1:\"t\";s:20:\"ckeditor_show_toggle\";s:1:\"t\";s:14:\"ckeditor_width\";s:4:\"100%\";s:13:\"ckeditor_lang\";s:2:\"en\";s:18:\"ckeditor_auto_lang\";s:1:\"t\";}","workbench_moderation":{"current":{"hid":"158819","vid":"152299","nid":"20029","from_state":"needs_review","state":"published","uid":"41927","stamp":"1762348896","published":"1","is_current":1,"title":"Construction Programme and Construction Method Statement - Neart na Gaoithe Offshore Wind Farm (Revised Design)","timestamp":"1762348896"},"published":{"hid":"158819","vid":"152299","nid":"20029","from_state":"needs_review","state":"published","uid":"41927","stamp":"1762348896","published":"1","is_current":1,"title":"Construction Programme and Construction Method Statement - Neart na Gaoithe Offshore Wind Farm (Revised Design)","timestamp":"1762348896"},"my_revision":{"hid":"158819","vid":"152299","nid":"20029","from_state":"needs_review","state":"published","uid":"41927","stamp":"1762348896","published":"1","is_current":1,"title":"Construction Programme and Construction Method Statement - Neart na Gaoithe Offshore Wind Farm (Revised Design)","timestamp":"1762348896"}}}