{"vid":"125956","uid":"0","title":"Operation and Maintenance Programme - MeyGen Tidal Energy Project - Inner Sound, Pentland Firth","log":"Edited by NikoletaP.","status":"1","comment":"0","promote":"0","sticky":"0","ds_switch":"","nid":"20589","type":"data_source","language":"und","created":"1602145198","changed":"1685343727","tnid":"0","translate":"0","revision_timestamp":"1685343727","revision_uid":"2","body":{"und":[{"value":"
Operations and Maintenance Programme associated with the operational period of phase 1A of the MeyGen Tidal Energy Project located in Inner Sound, Pentland Firth (July 2016)
\r\n","summary":"","format":"filtered_html","safe_value":"Operations and Maintenance Programme associated with the\u00a0operational period of phase 1A of\u00a0the MeyGen Tidal Energy Project located in Inner Sound, Pentland Firth (July 2016)
\n","safe_summary":""}]},"field_type":{"und":[{"tid":"1871"}]},"field_datasource_link":[],"field_citation":[],"field_reference":[],"field_map_type_tag":[],"field_datasource_keywords":[],"field_tags":[],"field_manual_data_tag":[],"field_data_owner":[],"field_document":{"und":[{"fid":"180854","uid":"32081","filename":"Operations and Maintenance Programme (July 2016)","uri":"public://mey-1a-70-hse-019-d-omp.pdf","filemime":"application/pdf","filesize":"775500","status":"1","timestamp":"1602145159","type":"document","_drafty_revision_requested":"FIELD_LOAD_CURRENT","rdf_mapping":[],"path":{"pathauto":"1"},"title":"","alt":"","metadata":[],"display":"1","description":""},{"fid":"180853","uid":"32081","filename":"Discharge Letter (October 2016)","uri":"public://8._approval_of_omp_and_discharge_of_s36_condition_15_-_unsigned.pdf","filemime":"application/pdf","filesize":"41070","status":"1","timestamp":"1602145065","type":"document","_drafty_revision_requested":"FIELD_LOAD_CURRENT","rdf_mapping":[],"path":{"pathauto":"1"},"title":"","alt":"","metadata":[],"display":"1","description":""}]},"field_mslot_stage":{"und":[{"tid":"1870"}]},"field_mslot_application_type":{"und":[{"tid":"1916"}]},"field_mslot_other_document_categ":{"und":[{"tid":"1905"}]},"field_date_submitted":{"und":[{"value":"2016-07-29 00:00:00","timezone":"Europe/London","timezone_db":"Europe/London","date_type":"datetime"}]},"field_mslot_ag_categories":[],"field_cfwg_category":[],"field_transfer_and_delegation_do":[],"rdf_mapping":{"rdftype":["sioc:Item","foaf:Document"],"title":{"predicates":["dc:title"],"type":"property"},"created":{"predicates":["dc:date","dc:created"],"datatype":"xsd:dateTime","callback":"date_iso8601"},"changed":{"predicates":["dc:modified"],"datatype":"xsd:dateTime","callback":"date_iso8601"},"body":{"predicates":["content:encoded"],"type":"property"},"uid":{"predicates":["sioc:has_creator"],"type":"rel"},"name":{"predicates":["foaf:name"]},"comment_count":{"predicates":["sioc:num_replies"],"datatype":"xsd:integer"},"last_activity":{"predicates":["sioc:last_activity_date"],"datatype":"xsd:dateTime","callback":"date_iso8601"}},"path":"https://marine.gov.scot/data/operation-and-maintenance-programme-meygen-tidal-energy-project-inner-sound-pentland-firth","name":"","picture":"0","data":null,"workbench_moderation":{"current":{"hid":"140671","vid":"125956","nid":"20589","from_state":"published","state":"published","uid":"2","stamp":"1685343727","published":"1","is_current":1,"title":"Operation and Maintenance Programme - MeyGen Tidal Energy Project - Inner Sound, Pentland Firth","timestamp":"1685343727"},"published":{"hid":"140671","vid":"125956","nid":"20589","from_state":"published","state":"published","uid":"2","stamp":"1685343727","published":"1","is_current":1,"title":"Operation and Maintenance Programme - MeyGen Tidal Energy Project - Inner Sound, Pentland Firth","timestamp":"1685343727"},"my_revision":{"hid":"140671","vid":"125956","nid":"20589","from_state":"published","state":"published","uid":"2","stamp":"1685343727","published":"1","is_current":1,"title":"Operation and Maintenance Programme - MeyGen Tidal Energy Project - Inner Sound, Pentland Firth","timestamp":"1685343727"}}}