{"vid":"140393","uid":"41924","title":"MFRAG \u2013 Main Group \u2013 Beatrice Offshore Windfarm \u2013 Post-Construction Benthic Grab Survey Report (Year Two)","log":"Edited by ElizabethS.","status":"1","comment":"0","promote":"0","sticky":"0","ds_switch":"","nid":"22090","type":"data_source","language":"und","created":"1648642118","changed":"1689675915","tnid":"0","translate":"0","revision_timestamp":"1689675915","revision_uid":"43606","body":[],"field_type":{"und":[{"tid":"1871"}]},"field_datasource_link":[],"field_citation":[],"field_reference":[],"field_map_type_tag":[],"field_datasource_keywords":[],"field_tags":[],"field_manual_data_tag":[],"field_data_owner":[],"field_document":{"und":[{"fid":"206579","uid":"135029","filename":"Benthic Grab Survey Report (Year Two)","uri":"public://p6764_beatrice_owf_-_benthic_grab_survey_monitoring_report_year_2_post-construction_-_12.01.2022_final_redacted.pdf","filemime":"application/pdf","filesize":"2881649","status":"1","timestamp":"1689670363","type":"document","_drafty_revision_requested":"FIELD_LOAD_CURRENT","rdf_mapping":[],"path":{"pathauto":"0"},"title":"","alt":"","metadata":[],"display":"1","description":""}]},"field_mslot_stage":{"und":[{"tid":"1870"}]},"field_mslot_application_type":[],"field_mslot_other_document_categ":[],"field_date_submitted":{"und":[{"value":"2022-03-30 00:00:00","timezone":"Europe/London","timezone_db":"Europe/London","date_type":"datetime"}]},"field_mslot_ag_categories":{"und":[{"tid":"2032"}]},"field_cfwg_category":[],"field_transfer_and_delegation_do":[],"rdf_mapping":{"rdftype":["sioc:Item","foaf:Document"],"title":{"predicates":["dc:title"],"type":"property"},"created":{"predicates":["dc:date","dc:created"],"datatype":"xsd:dateTime","callback":"date_iso8601"},"changed":{"predicates":["dc:modified"],"datatype":"xsd:dateTime","callback":"date_iso8601"},"body":{"predicates":["content:encoded"],"type":"property"},"uid":{"predicates":["sioc:has_creator"],"type":"rel"},"name":{"predicates":["foaf:name"]},"comment_count":{"predicates":["sioc:num_replies"],"datatype":"xsd:integer"},"last_activity":{"predicates":["sioc:last_activity_date"],"datatype":"xsd:dateTime","callback":"date_iso8601"}},"path":"https://marine.gov.scot/?q=data/mfrag-main-group-beatrice-offshore-windfarm-benthic-grab-survey-report-year-two","name":"HannahD","picture":"0","data":"a:5:{s:16:\"ckeditor_default\";s:1:\"t\";s:20:\"ckeditor_show_toggle\";s:1:\"t\";s:14:\"ckeditor_width\";s:4:\"100%\";s:13:\"ckeditor_lang\";s:2:\"en\";s:18:\"ckeditor_auto_lang\";s:1:\"t\";}","workbench_moderation":{"current":{"hid":"142551","vid":"140393","nid":"22090","from_state":"needs_review","state":"published","uid":"43606","stamp":"1689675915","published":"1","is_current":1,"title":"MFRAG \u2013 Main Group \u2013 Beatrice Offshore Windfarm \u2013 Post-Construction Benthic Grab Survey Report (Year Two)","timestamp":"1689675915"},"published":{"hid":"142551","vid":"140393","nid":"22090","from_state":"needs_review","state":"published","uid":"43606","stamp":"1689675915","published":"1","is_current":1,"title":"MFRAG \u2013 Main Group \u2013 Beatrice Offshore Windfarm \u2013 Post-Construction Benthic Grab Survey Report (Year Two)","timestamp":"1689675915"},"my_revision":{"hid":"142551","vid":"140393","nid":"22090","from_state":"needs_review","state":"published","uid":"43606","stamp":"1689675915","published":"1","is_current":1,"title":"MFRAG \u2013 Main Group \u2013 Beatrice Offshore Windfarm \u2013 Post-Construction Benthic Grab Survey Report (Year Two)","timestamp":"1689675915"}}}