Caithness Moray HVDC Cable
The Licensing Operations Team of Marine Scotland (MS-LOT) is the licensing authority, on behalf of Scottish Ministers, which determines applications for ‘marine licences’ under Part 4 of the Marine (Scotland) Act 2010.
An applicant has approached MS-LOT to seek a marine licence, further details can be found in the documentation.
Should you have any comments on the application, we would be grateful if they could be sent to us in an electronic format at ms.marinelicensing@gov.scot by 18 March 2019.
Please note that this application is for a variation to two existing licences. The variation seeks to vary the following marine licenses as detailed:
06600/18/1
Summary of variation requested:
- Additional 25 000 tonnes of rock, between 10 and 600mm in size
- Update to installation method to include Controlled Flow Excavation (CFE)
- Installation of up to 1000m of cable protection system i.e Cast Iron Shell or Tekmar or similar up to 500mm dia
- Update to cable burial plan
06043/18/3
Summary of variation requested:
- Additional 90 000 tonnes of rock, between 10 and 600mm in size
- Update to installation method to include Controlled Flow Excavation (CFE)
- Update to cable burial plan
To support this variation request the following documents have been submitted:
- CMS Method statement
- Caithness-Moray HVDC CFE and rock placement appraisal
- Caithness-Moray HVDC CFE and rock placement appraisal appendix A MPA Assessment
- Letter reviewing works against existing licences MS EPS 01 2018 2 & MS BS 02 2018 1
- Appendix 11 Subsea cable EMP
- Updated cable Burial Plan
- Updated FLMAP
- Updated Communications Plan
Project Applications and supporting documentation
Application stage | Application type | Date submitted | |
---|---|---|---|
06600 - Marine Rock Protection Works - Reinforcement - Portgordon & Noss Head | Post-consent | Construction, alteration or improvement of any works | |
04368 - Marine Cable Installation Works - Noss Head | Post-consent | Cable | |
06043 - Marine Construction Works - Outwith 12 nautical miles | Post-consent | Construction, alteration or improvement of any works | |
04878 - Marine Cable Installation Works - Portgordon | Post-consent | Cable |
Application stage | Application type | Date submitted | |
---|---|---|---|
MS EPS 01 2018 3 - EPS Licence Variation | Licence | Other | |
06600/06043 – Fisheries Liaison and Mitigation Plan | Application | Cable | |
06600/06043 – Communications Strategy | Application | Cable | |
06600/06043 – Letter of Works | Application | Cable | |
06600/06043 – Environmental Appraisal | Application | Cable | |
06600/06043 – Protected Area Assessment | Application | Cable | |
06600/06043 – Environmental Management Plan | Application | Cable | |
06600/06043 – Cable Plan | Application | Cable | |
06600/06043 – Method Statement | Application | Cable | |
Caithness Orkney HVDC Cable - Environmental Assessment Content Advice | Pre-application | 2018-11-27 |