Section 36 consent and Generating Station marine licence variation – Inch Cape Offshore Windfarm (Revised Design), Firth of Forth – Variation of turbine spacing and design parameters
Application type:
Renewables - Wind
Application stage:
Pre-application
Applicant name:
Inch Cape Offshore Limited
Applicant address:
5th Floor
40 Princes Street
Edinburgh
EH2 2BY
Date of application:
2022-07-04
This application is part of the following projects:
MS-LOT Associated application docs
stage document was submitted | Application type | Date submitted | |
---|---|---|---|
Inch Cape Offshore Windfarm (Revised Design), Firth of Forth – Proposed Variation – Screening Opinion | Pre-application | Renewables - Wind | 2022-09-16 |
Inch Cape Offshore Windfarm (Revised Design), Firth of Forth – Proposed Variation – Screening Request and Report | Pre-application | Renewables - Wind | 2022-07-04 |
stage document was submitted | Application type | Date submitted | |
---|---|---|---|
Inch Cape Offshore Windfarm (Revised Design), Firth of Forth - 2022 Section 36 consent and Generating Station marine licence Variation - Variation Application | Application | Renewables - Wind | 2022-12-15 |
stage document was submitted | Application type | Date submitted | |
---|---|---|---|
2023 Section 36 consent variation - Submission to Ministers - Inch Cape Offshore Windfarm (Revised Design) | Determination | Renewables - Wind | 2023-06-08 |
2023 Section 36 consent and generating station marine licence variation - Consultation Responses - Inch Cape Offshore Windfarm (Revised Design), Firth of Forth | Determination | Renewables - Wind | 2023-03-01 |
2023 Section 36 consent and generating station marine licence variation - Appropriate Assessment Validation - Inch Cape Offshore Windfarm (Revised Design), Firth of Forth | Determination | Renewables - Wind | 2023-03-30 |
stage document was submitted | Application type | Date submitted | |
---|---|---|---|
2023 Section 36 consent variation - Decision Notice - Inch Cape Offshore Windfarm (Revised Design) | Licence | Renewables - Wind | 2023-06-14 |
Decision notices, where issued, are available for inspection from the table below and describe the works and terms of the decision.
stage document was submitted | Application type | Date submitted | |
---|---|---|---|
Extension to Commencement of Development – Construction and Operation of Offshore Windfarm – Inch Cape Offshore Windfarm (Revised Design), Firth of Forth | Post-consent | Renewables - Wind | 2023-08-01 |