Post-consent

The table below lists all marine licence applications, projects and documentation submitted to Marine Scotland Information and associated with the Post-consent term.
MSLOT application type Date of application (if applicable) Licence commencement date (as granted) (if applicable)
Robin Rigg Offshore Windfarm - 06846/19/2 - Marine Licence Variation Renewables - Wind
Environmental Clark of Works (“ECoW”) approval letter Renewables - Wind
06178 - Construction and Operation of Generating Station - Dounreay Trì Floating Wind Demonstration Project - Caithness, North coast of Scotland Renewables - Wind 2019-03-14 2019-07-23
06174 - Construction and Operation of Transmission Works - Dounreay Trì Floating Wind Demonstration Project - Caithness, North coast of Scotland Renewables - Wind 2019-03-14 2019-07-23
MS EPS 17/2019/00 - Operation & Maintenance Works - European Protected Species - Aberdeen Bay Renewables - Wind 2019-05-29 2019-07-22
Moray East Offshore Windfarm - MFRAG minute of meeting of 08/05/19 Renewables - Wind
06302 - Alternative Cable Installation - Beatrice Offshore Wind Farm, Moray Firth Renewables - Wind 2016-12-15 2017-04-11
Beatrice Offshore Wind Farm - Non-Compliance Notice - Citra Clean Concentrate Renewables - Wind
Kincardine Offshore Floating Windfarm- Marine Mammal Observer Approval letter Renewables - Wind
Moray East Offshore Windfarm – Offshore Transmission Infrastructure Piling Strategy (OfTI PS) Renewables - Wind
06588 - Western Ferries (Clyde) Limited - Construction of Secondary Berth - Hunter's Quay, Dunnonn Construction, alteration or improvement of any works 2019-05-31
06588 - Marine Licence Variation Construction, alteration or improvement of any works
06825/06826 - Notice of Decision 2 Construction of new works
06825/06826 - Notice of Decision 1
MS EPS 06/2018/1 - European Protected Species Licence - Nigg Bay, Aberdeen Other
06676 - Annex One Variation Navigational dredging
Moray East Offshore Windfarm – Vessel Management Plan and Navigational Safety Plan (VMP & NSP) Renewables - Wind
Moray East Offshore Windfarm – Piling Strategy (PS) Renewables - Wind
Moray East Offshore Windfarm – Offshore Transmission Infrastructure Cable Plan (OfTI CaP) Renewables - Wind
Moray East Offshore Windfarm – Cable Plan (CaP) Renewables - Wind
Moray East Offshore Windfarm - Offshore Transmission Infrastructure Cable Plan Renewables - Wind
Moray East Offshore Windfarm - Cable Plan Renewables - Wind
Moray East Offshore Windfarm - Vessel Management Plan (VMP) and Navigational Safety Plan (NSP) Renewables - Wind
Beatrice Offshore Wind Farm - Durga Devi Non-Compliance Notice Renewables - Wind
Section 36 Consent Variation - European Offshore Wind Deployment Center, Aberdeen Bay Renewables - Wind 2019-04-11
Samsung Section 36 Variation Application Renewables - Wind 2014-10-03 2016-03-23
Fife Energy Park Offshore Demonstration Wind Turbine Renewables - Wind 2012-07-26 2013-05-03
Section 36 Consent Variation - Kincardine Offshore Windfarm Renewables - Wind 2017-11-28
05914 - Kincardine Offshore Windfarm - Marine Licence Application Renewables - Wind 2016-04-07 2017-03-07
Moray West Offshore Windfarm - Information to Inform HRA - Great Black-backed Gull - consultation responses Renewables - Wind
Section 36 Consent - Construction and Operation of Offshore Windfarm and Transmissio Works - Beatrice Offshore Windfarm, Moray Firth Renewables - Wind 2012-04-23 2014-08-15
Beatrice Marine Licence for Waverider Buoys Renewables - Wind 2017-07-26
04461 - Offshore Transmission Works - Beatrice Offshore Wind Farm, Moray Firth Renewables - Wind 2012-04-23 2014-08-15
04462 - Offshore Generating Station - Beatrice Offshore Wind Farm, Moray Firth Renewables - Wind 2012-04-23 2014-08-15
Inch Cape Offshore Windfarm - Commencement of the Development Extension - Request Letter (2017) Renewables - Wind
Inch Cape Offshore Windfarm - Commencement of the Development Extension - Ministerial Submission (2018) Renewables - Wind
Inch Cape Offshore Windfarm - Commencement of the Development Extension - Decision Letter (2018) Renewables - Wind
Inch Cape Offshore Windfarm - Section 36 Condition 2 Extension - Consultation Responses Renewables - Wind
Inch Cape Offshore Windfarm - Section 36A Declaration (2014) Renewables - Wind
Inch Cape Offshore Windfarm - ECoW Documentation (2016) Renewables - Wind
Inch Cape Offshore Windfarm - ECoW Condition Discharge Letter (2016) Renewables - Wind
Inch Cape Offshore Windfarm - ECoW Approval (2016) Renewables - Wind
Trenching at Landfall - Seagreen Alpha and Seagreen Bravo Offshore Windfarm, Firth of Forth Renewables - Wind 2019-04-10
Seagreen Alpha and Bravo Offshore Windfarm – Consenting Approach Document Renewables - Wind
06978 - Installation of a Subsea Hub - Inner Sound, Pentland Firth Renewables - Tidal 2019-03-27
Section 36 Consent - Construction and Operation of Offshore Windfarm and Transmission Works - Inch Cape Offshore Windfarm, Firth of Forth Renewables - Wind 2013-07-01
Moray East Offshore Windfarm - Air Traffic Control Radar Mitigation Scheme Approval Letter Renewables - Wind
Moray East Offshore Windfarm - Environmental Clerk of Works (ECoW) Approval Letter Renewables - Wind
Moray East Offshore Windfarm - Marine Archeological Reporting Protocol (MARP) and “Written Scheme of Investigation” (WSI) Renewables - Wind
Moray East Offshore Windfarm - Exempted Activity Notice – Sediment Sampling Renewables - Wind
Moray East Offshore Windfarm - Exempted Activity Notice – Salmon Tracking Study Renewables - Wind
Moray East Offshore Windfarm - Emergency Response Cooperation Plan (ERCoP) Renewables - Wind
Moray East Offshore Windfarm - Traffic and Transportation Plan (TTP) Renewables - Wind
Moray East Offshore Windfarm - Television and Radio Reception Mitigation Plan (TRRMP) Renewables - Wind
Moray East Offshore Windfarm - MFRAG minute of meeting of 26/07/18 Renewables - Wind
Inch Cape Offshore Windfarm - European Protected Species and Sediment Sampling Licences Variation Application Renewables - Wind
Robin Rigg Offshore Windfarm Renewables - Wind
Nova Innovation Tidal Turbine Array - Cable Plan (CaP) Renewables - Wind
Moray East Offshore Windfarm - Addendum to the Marine Mammals Monitoring Plan Renewables - Wind
MeyGen Tidal Energy Project Renewables - Tidal
Moray Firth Regional Advisory Group (MFRAG) Renewables - Wind
MFRAG - Ornithology - Moray East Offshore Windfarm - Pre-construction Aerial Survey Report 2018 Renewables - Wind
Section 36 Consent Variation - Neart na Gaoithe Offshore Windfarm (Revised Design), Firth of Forth Renewables - Wind 2019-01-08 2019-06-04
Moray East Offshore Windfarm - Assignation - Telford Intimation of Assignation Renewables - Wind
Moray East Offshore Windfarm - Assignation - Stevenson Intimation of Assignation Renewables - Wind
Moray East Offshore Windfarm - Assignation - MacColl Intimation of Assignation Renewables - Wind
Moray East Offshore Windfarm - Assignation - MacColl Assignation Renewables - Wind
Moray East Offshore Windfarm - Assignation - Stevenson Assignation Renewables - Wind
Moray East Offshore Windfarm - Assignation - Telford Assignation Renewables - Wind
Moray East Offshore Windfarm - Assignation - Telford Assignor Letter Renewables - Wind
Moray East Offshore Windfarm - Assignation - Telford Assignee Letter Renewables - Wind
Moray East Offshore Windfarm - Assignation - Stevenson Assignee Letter Renewables - Wind
Moray East Offshore Windfarm - Assignation - Stevenson Assignor Letter Renewables - Wind
Moray East Offshore Windfarm - Assignation - MacColl Assignor Letter Renewables - Wind
Moray East Offshore Windfarm - Assignation - MacColl Assignee Letter Renewables - Wind
Moray East Offshore Windfarm - Design Statement Renewables - Wind
Forthwind Offshore Development Phase 1 - S36 Variation - Consultation Responses Renewables - Wind
Forthwind Offshore Development Phase 1 Renewables - Wind
Kincardine Offshore floating windfarm - Discharge letter Renewables - Wind
Kincardine Offshore Floating Windfarm - Lighting and Marking Plan Renewables - Wind
Kincardine Offshore floating windfarm - Discharge letter Renewables - Wind
Kincarding Offshore floating windfarm - Discharge letter Renewables - Wind
Moray East Offshore Windfarm - Appropriate assessment Renewables - Wind
Moray East Offshore Windfarm - EPS Licence Cover letter Renewables - Wind
Moray East Offshore Windfarm - EPS licence 2018 3 Renewables - Wind
European Offshore Wind Deployment Centre - discharge letter Renewables - Wind
European Offshore Wind Deployment Centre - Discharge letter Renewables - Wind
European Offshore Wind Deployment Centre - Discharge letter Renewables - Wind
European Offshore Wind Deployment Centre - Discharge letter Renewables - Wind
Forthwind Offshore Development Phase 1 - Variation decision letter Renewables - Wind
06475 - Construction - Glasgow Construction of new works 2017-07-04 2019-03-01
AHEP - CEMD - South Breakwater and Shore Blasting Revision 4.1 Use of explosive substance or article
Non Compliance Report - Breach of Section.36 (“s.36”) and Marine Licence Conditions - Piling Strategy Renewables - Wind
Moray East Offshore Windfarm - Environmental Management Plan (EMP) Renewables - Wind
Moray East Offshore Windfarm - Project Environmental Monitoring Programme (PEMP) Renewables - Wind
Moray East Offshore Windfarm - Marine Pollution Contingency Plan (MPCP) Renewables - Wind
Moray East Offshore Windfarm - Construction Programme and Construction Method Statement (CoP & CMS) Renewables - Wind
Moray East Offshore Windfarm - Lighting and Marking Plan (LMP) Renewables - Wind
Forthwind - Section 36 consent variation - 2018 Renewables - Wind
European Offshore Wind Deployment Centre - 06573/18/2 - Chemical Usage and Fluorinated GHGs Discharge Letter Renewables - Wind
MeyGen - Section 36 consent variation - 2018 Renewables - Tidal
Moray East Offshore Windfarm - Development Specification and Layout Plan (DSLP) Renewables - Wind
Moray East Offshore Windfarm Renewables - Wind
AHEP - CEMD - Underwater Noise & Passive Acoustic Monitoring Procedure (PAM) Revision 7 Use of explosive substance or article
AHEP - CEMD - Drilling & Blasting Methodology - Environmental Controls - Marine Mammals Revision 7 Use of explosive substance or article
Beatrice Offshore Windfarm Renewables - Wind
Port of Cromarty Firth - Phase 4 - Determination - Public Notice
Port of Cromarty Firth - Phase 4 - Construction Environmental Management Document - version 3 - 07 August 2018
Beatrice Offshore Windfarm - Piling Strategy Implementation Report Renewables - Wind
Kincardine Offshore Windfarm Renewables - Wind
Seagreen Alpha and Bravo Offshore Wind Farms Renewables - Wind
Section 36 Consent Variation - Operation of Levenmouth Demonstration Turbine, Firth of Forth Renewables - Wind 2018-02-08
Levenmouth Demonstration Turbine Renewables - Wind
Kincardine Offshore Windfarm - Section 36 consent - Decision Letter and Conditions Renewables - Wind
Kincardine Offshore Windfarm - Operations and Maintenance Programme (OMP) Renewables - Wind
Kincardine Offshore Windfarm - Noise Registry Renewables - Wind
Kincardine Offshore Windfarm - Navigational Safety Plan (NSP) Renewables - Wind
Kincardine Offshore Windfarm - Marine Mammal Observer (MMO) Renewables - Wind
Kincardine Offshore Windfarm - Marine Archaeological Reporting Plan (MARP) Renewables - Wind
Kincardine Offshore Windfarm - Lighting and Marking Plan (LMP) Renewables - Wind
Kincardine Offshore Windfarm - Fluorinated Greenhouse Gases Renewables - Wind
Kincardine Offshore Windfarm - Fisheries Management and Mitigation Strategy - (FMMS) Renewables - Wind
Kincardine Offshore Windfarm - Fisheries Liason Officer (FLO) Renewables - Wind
Kincardine Offshore Windfarm - Environmental Management Plan (EMP) Renewables - Wind
Kincardine Offshore Windfarm - Environmental Clerk of Works (ECoW) Renewables - Wind
Kincardine Offshore Windfarm - Development Specification and Layout Plan (DSLP) Renewables - Wind
Kincardine Offshore Windfarm - Design Statement (DS) Renewables - Wind
Kincardine Offshore Windfarm - Decommissioning Programme (DP) Renewables - Wind
Kincardine Offshore Windfarm - Construction Programme (CoP) Renewables - Wind
Kincardine Offshore Windfarm - Construction Method Statement (CMS) Renewables - Wind
Kincardine Offshore Windfarm - Commencement of Works Renewables - Wind
Kincardine Offshore Windfarm - Cable Plan (CaP) Renewables - Wind
06600 - Marine Rock Protection Works - Reinforcement - Portgordon & Noss Head Construction, alteration or improvement of any works 2019-04-12
04368 - Marine Cable Installation Works - Noss Head Cable 2016-04-01
06043 - Marine Construction Works - Outwith 12 nautical miles Construction, alteration or improvement of any works 2017-12-05 2016-07-01
04878 - Marine Cable Installation Works - Portgordon Cable 2018-08-01
Caithness Moray HVDC Cable Cable
Beatrice Offshore Wind Farm - Operations and Maintenance Programme (Offshore Transmission Assets) Renewables - Wind
Beatrice Offshore Wind Farm - Operations and Maintenance Programme (Wind Farm Assets) Renewables - Wind
Beatrice Offshore Wind Farm - Operational and Maintenance Plan Renewables - Wind
Beatrice Offshore Wind Farm - Offshore Transmission Works (OfTW), Conditions 3.2.2.3 and 3.2.2.5 - Navigational Safety Renewables - Wind
Beatrice Offshore Wind Farm - Noise Registry Renewables - Wind
Beatrice Offshore Wind Farm - Chemical Usage Renewables - Wind
Beatrice Offshore Wind Farm - Offshore Transmission Works (OfTW) - Condition 3.2.2.14 - Navigational and Aviation Safety and Charting Renewables - Wind
Beatrice Offshore Wind Farm - Construction Method Statement (CMS) (Offshore Transmission Works) Renewables - Wind
Beatrice Offshore Wind Farm - Cable Plan (CaP) Offshore Transmission Works Renewables - Wind
Beatrice Offshore Wind Farm - Offshore Transmission Works Development Specification and Layout Plan Renewables - Wind
Beatrice Offshore Wind Farm - Traffic and Transportation Plan Renewables - Wind
Beatrice Offshore Wind Farm - Marine Pollution Contingency Plan (MPCP) Renewables - Wind
Beatrice Offshore Wind Farm - Air Traffic Control Radar Mitigation Scheme Renewables - Wind
Beatrice Offshore Wind Farm - Project Environmental Monitoring Plan (PEMP) Renewables - Wind
Beatrice Offshore Wind Farm - Cable Plan, Offshore Windfarm (CaP-OfWF) Renewables - Wind
Beatrice Offshore Wind Farm - Third Party Certification Renewables - Wind
Beatrice Offshore Wind Farm - Vessel Management Plan (VMP) Renewables - Wind
Beatrice Offshore Wind Farm - Lighting and Marking Plan (LMP) Renewables - Wind
Beatrice Offshore Wind Farm - Navigational Safety Plan (NSP) Renewables - Wind
Beatrice Offshore Wind Farm - Decommissioning Programme Discharge Letter Renewables - Wind
Beatrice Offshore Wind Farm - Met Mast Letter Renewables - Wind
Beatrice Offshore Wind Farm - Development and Specification Layout Plan Renewables - Wind
Beatrice Offshore Wind Farm - Commercial Fisheries Mitigation Strategy Renewables - Wind
Beatrice Offshore Wind Farm - Piling Strategy Renewables - Wind
Beatrice Offshore Wind Farm - Television and Radio Reception Mitigation Plan (TRRMP) Renewables - Wind
Beatrice Offshore Wind Farm - Construction Method Statement Renewables - Wind
Beatrice Offshore Wind Farm - Environmental Management Plan (EMP) Renewables - Wind
Beatrice Offshore Wind Farm - Construction Programme Renewables - Wind
Beatrice Offshore Wind Farm - Primary Radar Mitigation Scheme (PRMS) Renewables - Wind
Beatrice Offshore Wind Farm - Marine Archaeology Plan (MAP) Renewables - Wind
Beatrice Offshore Wind Farm - Design Statement Renewables - Wind
Beatrice Offshore Wind Farm - Piling Mitigation for Herring Renewables - Wind
Beatrice Offshore Wind Farm - Pre-construction Baseline Cod and Sandeel Surveys (BCSS) Renewables - Wind
Beatrice Offshore Wind Farm - Ecological Clerk of Works (ECoW) Renewables - Wind
Beatrice Offshore Wind Farm - Diadromous Fish Monitoring (DFM) Renewables - Wind
Beatrice Offshore Wind Farm - Marine Mammal Monitoring Programme (MMMP) Renewables - Wind
Beatrice Offshore Wind Farm - Fisheries Liaison Officer (FLO) Renewables - Wind
Beatrice Offshore Wind Farm - Collision Risk Modelling (CRM) - Turbine Parameters Renewables - Wind
Beatrice Offshore Wind Farm - Compliance Letter Renewables - Wind
Beatrice Offshore Wind Farm - SHL Compliance Letter - Chemical Usage Renewables - Wind
Beatrice Offshore Wind Farm - Installation of Radar and Radio Beacons (Ofcom) Renewables - Wind
Neart na Gaoithe Offshore Windfarm Renewables - Wind
MS EPS 16 2018 2 - European Protected Species licence - Inch Cape Offshore Windfarm and Cable Corridor, Firth of Forth Renewables - Wind 2019-05-29 2019-06-18
Inch Cape Offshore Windfarm Renewables - Wind
Inch Cape Offshore Windfarm (Revised Design) Renewables - Wind
MS EPS 06/2018/0 - European Protected Species licence - Nigg Bay, Aberdeen Construction of new works 2018-03-25 2018-04-27
MS EPS 27/2017/0 - European Protected Species licence - Nigg Bay, Aberdeen Construction of new works 2018-09-04
05964 - Capital Dredging and Dredge Spoil Disposal - Nigg Bay, Aberdeen Dredging 2018-02-08 2018-04-26
Aberdeen Harbour Expansion - Construction Environmental Management Document (CEMD) Construction of new works
Hywind Scotland Pilot Park Renewables - Wind
06359 - Deposit of acoustic doppler current profilers - Aberdeen Bay Deposit of any substance or object 2017-04-21 2017-07-28
MS EPS 12/2016/0 - European Protected Species Geophysical Survey - Peterhead, Aberdeenshire Renewables - Wind 2016-07-25 2016-09-09
06461 - Deposit of waverider buoy - Aberdeen Bay Deposit of any substance or object 2017-07-05 2017-09-29
05515 - Renewables Construction Works and Deposits - Peterhead, Aberdeenshire Renewables - Wind 2015-03-27 2015-10-30
06573 - Removal of floating LiDAR device - Aberdeen Bay Removal of any substance or object 2017-11-17 2018-02-06
06436 - Deposit of floating LiDAR device - Aberdeen Bay Renewables - Wind 2017-06-23 2017-09-29
European Offshore Wind Deployment Centre - Offshore Environmental Management Plan (OEMP) Renewables - Wind
06294 - Installation of Rock - Peterhead, Aberdeenshire Renewables - Wind 2015-03-27 2017-07-14
04309 - Marine renewables construction works and deposits - Aberdeen Bay Renewables - Wind 2013-02-26 2013-05-01
06416/17/0 - Deposit of Waverider Buoy - Peterhead, Aberdeenshire Renewables - Wind 2016-12-16 2017-07-07
Section 36 Consent - Aberdeen Bay Renewables - Wind 2013-03-25 2013-03-26
European Offshore Wind Deployment Centre - 06357/17/1 - Discharge Letter - Blackdog Ranges Renewables - Wind
European Offshore Wind Deployment Centre - 06357/17/1 - Discharge Letter - Availability of Licence for Inspection Renewables - Wind
European Offshore Wind Deployment Centre - 06357/17/1 - Discharge Letter - Fluorinated Gases Renewables - Wind
European Offshore Wind Deployment Centre - 06357/17/1 - Discharge Letter - Marine Mammals and Fish Recordings Renewables - Wind
European Offshore Wind Deployment Centre - 06357/17/1 - Discharge Letter - Nature and Quantity of all UXOs Renewables - Wind
European Offshore Wind Deployment Centre - 06357/17/1 - Discharge Letter - Environmental Protection - Waste Disposal Renewables - Wind
European Offshore Wind Deployment Centre - 06357/18/0 - Discharge Letter - Noise Registry Renewables - Wind
European Offshore Wind Deployment Centre - 06359/17/1 - Discharge Letter - Aberdeen Harbour Consultation Renewables - Wind
European Offshore Wind Deployment Centre - 06359/17/1 - Discharge Letter - Radio Beacon and Licence Available for Inspection Renewables - Wind
European Offshore Wind Deployment Centre - 06359/17/1 - Discharge Letter - Licence to Contractor Renewables - Wind
European Offshore Wind Deployment Centre - 06359/17/1 - Discharge Letter - Source Data Receipt Notification Renewables - Wind
European Offshore Wind Deployment Centre - 06359/17/1 - Discharge Letter - Final Report on Deposits' Returns Renewables - Wind
European Offshore Wind Deployment Centre - 06359/17/1 - Discharge Letter - Temporary Deposits Removal and No Debris or Waste Material Remains Renewables - Wind
European Offshore Wind Deployment Centre - 06359/17/0 - Discharge Letter - Commencement of Works Renewables - Wind
European Offshore Wind Deployment Centre - 06461/17/1 - Operation and Maintenance Programme Discharge Letter Deposit of any substance or object
European Offshore Wind Deployment Centre - 06461/17/1 - Transportation Audit Sheet and Nature and Quantity of Deposited Substances and Objects Compliance Letter Deposit of any substance or object
European Offshore Wind Deployment Centre - 06461/17/1 - Marking, Lighting and Signals of the Works Compliance Letter Deposit of any substance or object
European Offshore Wind Deployment Centre - 06461/17/1 - Navigation and Charting Discharge Letter
European Offshore Wind Deployment Centre - 06573/18/2 - Nature and Quantity of Deposited Substances and Objects Discharge Letter Removal of any substance or object
European Offshore Wind Deployment Centre - 06573/18/2 - Navigational Safety Discharge Letter Removal of any substance or object
European Offshore Wind Deployment Centre - Decommisioning Programme Renewables - Wind
European Offshore Wind Deployment Centre - Decision Notice - Construction Method Statement (CMS) Renewables - Wind
European Offshore Wind Deployment Centre - Decision Notice - Cable Laying Strategy (CLS) Renewables - Wind
European Offshore Wind Deployment Centre - Decision Notice - Navigational Safety Plan (NSP) Renewables - Wind
European Offshore Wind Deployment Centre - Decision Notice - Vessel Management Plan (VMP) Renewables - Wind
European Offshore Wind Deployment Centre - Decision Notice - Design Statement (DS) Renewables - Wind
Hywind Scotland Pilot Park - Forties Pipeline System Mitigation Agreement Renewables - Wind
Hywind Scotland Pilot Park - Forties Pipeline System Mitigation Discharge Letter Renewables - Wind
Hywind Scotland Pilot Park - Air Traffic Control Radar Mitigation Scheme Renewables - Wind
Hywind Scotland Pilot Park - Air Traffic Control Radar Mitigation Scheme Partial Discharge Letter Renewables - Wind
Hywind Scotland Pilot Park - Ecological Clerk of Works Discharge Letter Renewables - Wind
Hywind Scotland Pilot Park - Environmental Management Programme Discharge Letter Renewables - Wind
Hywind Scotland Pilot Park - Cable Plan Discharge Letter Renewables - Wind
Hywind Scotland Pilot Park - Environmental Management Programme Discharge Letter Renewables - Wind
Hywind Scotland Pilot Park - Construction Plan Revision 3 Renewables - Wind
Hywind Scotland Pilot Park - Construction Plan Consultee Responses Renewables - Wind
Hywind Scotland Pilot Park - Construction Plan Discharge Letter Renewables - Wind
Hywind Scotland Pilot Park - Project Environmental Monitoring Programme Renewables - Wind
Hywind Scotland Pilot Park - Project Environmental Monitoring Programme Cover Letter Renewables - Wind
Hywind Scotland Pilot Park - Project Environmental Monitoring Programme Consultation Responses Renewables - Wind
Hywind Scotland Pilot Park - Project Environmental Monitoring Programme Discharge Letter Renewables - Wind
Hywind Scotland Pilot Park - NATS Primary Radar Mitigation Scheme Implementation Letter Renewables - Wind
Hywind Scotland Pilot Park - Primary Rader Mitigation Scheme Discharge Letter Renewables - Wind
Hywind Scotland Pilot Park - Bathymetry Surveys Discharge Letter Renewables - Wind
Hywind Scotland Pilot Park - Third Party Verification/Certification Discharge Letter Renewables - Wind
Hywind Scotland Pilot Park - Navigation and Aviation Safety and Charting Discharge Letter Renewables - Wind
Hywind Scotland Pilot Park - FMMS Discharge Letter Renewables - Wind
Hywind Scotland Pilot Park - ATC Radar Mitigation Scheme Discharge Letter Renewables - Wind
Hywind Scotland Pilot Park - Fisheries Liaison Officer Discharge Letter Renewables - Wind
Hywind Scotland Pilot Park - Date of Completion of the Works Discharge Letter Renewables - Wind
Hywind Scotland Pilot Park - Final Commissioning of the Works Discharge Letter Renewables - Wind
Hywind Scotland Pilot Park - Operation and Management Programme Renewables - Wind
European Offshore Wind Deployment Centre - Decision Notice - Construction Noise Management Plan (CNMP) Renewables - Wind
Hywind Scotland Pilot Park - Operation and Management Programme Cover Letter Renewables - Wind
Hywind Scotland Pilot Park - Operation and Management Programme Consultee Responses Renewables - Wind
Hywind Scotland Pilot Park - Operation and Management Programme Discharge Letter Renewables - Wind
European Offshore Wind Deployment Centre - Decision Notice - Marine Pollution Contingency Plan (MPCP) Renewables - Wind
Hywind Scotland Pilot Park - Cable Plan Discharge Letter Renewables - Wind
Hywind Scotland Pilot Park - Environmental Management Programme Discharge Letter Renewables - Wind
Hywind Scotland Pilot Park - Construction Plan Revision 3 Renewables - Wind
European Offshore Wind Deployment Centre - Navigational Safety Renewables - Wind
Hywind Scotland Pilot Park - Construction Plan Consultee Responses Renewables - Wind
Hywind Scotland Pilot Park - Construction Plan Discharge Letter Renewables - Wind
European Offshore Wind Deployment Centre - Commencement of Works Renewables - Wind
European Offshore Wind Deployment Centre - Third Party Certification Renewables - Wind
European Offshore Wind Deployment Centre - Chemical Usage Renewables - Wind
European Offshore Wind Deployment Centre - Blackdog Firing Range Management Plan Renewables - Wind
European Offshore Wind Deployment Centre - Ecological Clerk of Works Renewables - Wind
Hywind Scotland Pilot Park - Commencement of Works Discharge Letter Renewables - Wind
European Offshore Wind Deployment Centre - Civil Radar Mitigation Scheme Renewables - Wind
European Offshore Wind Deployment Centre - Scientific Research and Monitoring Panel Renewables - Wind
Hywind Scotland Pilot Park - Exemption Letter for Sediment Sampling Renewables - Wind
European Offshore Wind Deployment Centre - Funding Mechanisms Renewables - Wind
Hywind Scotland Pilot Park - Addendum for Horizontal Directional Drilling Activities Renewables - Wind
European Offshore Wind Deployment Centre - Availabilty of the Licence for Inspection - Compliance Letter Renewables - Wind
European Offshore Wind Deployment Centre - Vessels, Agents, Contractors and Sub-contractors - Compliance Letter Renewables - Wind
Hywind Scotland Pilot Park - Updated Plan for Horizontal Directional Drilling Activities Renewables - Wind
European Offshore Wind Deployment Centre - Noise Registry Letter Renewables - Wind
Hywind Scotland Pilot Park - Horizontal Directional Drilling Discharge Letter Renewables - Wind
European Offshore Wind Deployment Centre - Appointment of Marine Mammal Observer Renewables - Wind
Hywind Scotland Pilot Park - Horizontal Directional Drilling Consultee Responses Renewables - Wind
Hywind Scotland Pilot Park - Plan for Horizontal Directional Drilling Activities Renewables - Wind
European Offshore Wind Deployment Centre - Fisheries Mitigation Strategy Renewables - Wind
Hywind Scotland Pilot Park - Decommissioning Programme Discharge Letter Renewables - Wind
European Offshore Wind Deployment Centre - Aviation Safety & Charting Renewables - Wind
European Offshore Wind Deployment Centre Renewables - Wind
05965 - Construction and Deposit of Explosives - Nigg Bay, Aberdeen Construction of new works 2016-05-17 2018-07-03
West Islay Tidal Energy Park Project Renewables - Tidal
West Islay Tidal Energy Park Renewables - Tidal 2013-09-16