Section 36 Consent Variation - Neart na Gaoithe Offshore Windfarm (Revised Design), Firth of Forth

Section 36 consent granted onĀ 3 December 2018 to Neart na Gaoithe Offshore Wind Limited ("NnNOWL") for the construction, operation and maintenance of the Neart Na Gaoithe Offshore Wind Farm, approximately 15.5km east of Fife Ness.

On 8 January 2019, NnGOWL submitted an application to the Scottish Ministers for a variation to the existing Section 36 Consent to remove of references to transmission infrastructure (i.e. offshore substation platforms, interconnector cables and offshore export cables) from the Description of the Development in Annex 1 and from Conditions 12 and 22 of Annex 2 and amend the reference to maximum blade width in Annex 1 from 4.5 metres to 5.5 metres.

Application reference number: 
050/OW/MainS - 10
Application type: 
Renewables - Wind
Application stage: 
Post-consent
Applicant name: 
Neart na Gaoithe Offshore Wind Limited
Applicant address: 
Atria One
144 Morrison Street
Edinburgh
EH3 8BE
United Kingdom
Licence holder: 
Neart na Gaoithe Offshore Wind Limited
Date of application: 
2019-01-08
Date licence granted: 
2019-06-04
Licence commencement date (as granted): 
2019-06-04

This application is part of the following projects:

MS-LOT Associated application docs