Submission to Ministers in respect of the request to vary the section 36 consent of the Neart na Gaoithe Offshore Windfarm
The variation application sought to amend Annex 1 and Annex 2 of the s.36 consent granted on 3 December 2018 to allow the following variations :
- The removal of references to the Offshore Substation Platforms (“OSPs”), interconnector cables, and Offshore Export Cables (“OEC”) from the Description of the Development in Annex 1 and from conditions 12 and 22 of Annex 2;
- Amendment of minimum blade tip clearance in Annex 1 from 35 metres to 36 metres (measured from Lowest Astronomical Tide (“LAT”)); and
- Amendment of blade width in Annex 1 from 4.5 metres to 5.5 metres
Download resources:
Attachment | Size |
---|---|
Submission to Ministers | 1.35 MB |
Document type:
Section 36 consent variation
Stage document submitted:
Determination
Type of application:
Renewables - Wind