Screening Report - Cumbrae Ferry Slipway Replacement - SCR-0077 Construction, alteration or improvement of any works
Screening - Cumbrae Ferry Slipway Replacement - SCR-0077 Construction, alteration or improvement of any works 2024-03-01
Screening Opinion - Flotta Ultra Deep Water Quay
Screening - Flotta Ultra Deep Water Quay Construction, alteration or improvement of any works 2024-02-22
Flotta Ultra Deep Water Quay
Scoping - Glen Ullinish Coastal Delivery Project Construction, alteration or improvement of any works
Scoping - Glen Ullinish Coastal Delivery Project Construction, alteration or improvement of any works 2024-02-14
Glen Ullinish Coastal Delivery Project Construction, alteration or improvement of any works
Marine Licence - Marina Construction - Catfirth, Nesting, Shetland - Scoping Opinion - SCOP-0019 Construction, alteration or improvement of any works
Scoping Opinion - Hunterston Construction Yard Development- Hunterston - SCOP-0033 Construction, alteration or improvement of any works
Screening Request - Sullom Voe Terminal Construction Jetty - Sullom Voe, Shetland - SCR-0075 Construction, alteration or improvement of any works
Screening Request - Sullom Voe Terminal Construction Jetty - Sullom Voe, Shetland - SCR-0075 Construction, alteration or improvement of any works 2024-02-02
Screening Request - Section 36 Consent Variation - Forthwind Offshore Wind Demonstration Project - Methil, Firth of Forth Renewables - Wind
Scoping Opinion - Port Ellen Terminal Development
HRA Screening Report - Buchan Offshore Wind Farm Renewables - Wind
Scoping Report – Broadshore Hub Wind Farm Development Areas, Moray Firth – January 2024 Renewables - Wind
HRA Screening Report – Broadshore Hub Wind Farm Development Areas, Moray Firth – January 2024 Renewables - Wind
Scoping – Broadshore Hub Wind Farm Development Areas, Moray Firth Renewables - Wind 2024-01-08
Broadshore Hub Offshore Wind Farms Renewables - Wind
HRA Screening Report - Stromar Offshore Wind Farm Renewables - Wind
Scoping Report - Stromar Offshore Wind Farm Renewables - Wind
Scoping - Stromar Offshore Wind Farm Renewables - Wind 2024-01-10
Scoping Opinion Request - South Ford Flood Risk Management Scheme Construction, alteration or improvement of any works
Scoping - South Ford Flood Risk Management Scheme - South Ford and Gualan Construction, alteration or improvement of any works 2024-12-18
Scoping - Eastern Inner Dock Quay - Nigg Energy Park Construction of new works 2023-12-15
Scoping Opinion Request - Nigg Eastern Inner Dock Quay Construction of new works
Scoping - Westray Tidal Array - Westray Firth Renewables - Tidal
Request for Environmental Impact Assessment Scoping Opinion - Westray Tidal Array - Westray Firth Renewables - Tidal
Westray Tidal Array Renewables - Tidal
Scoping Opinion – Buchan Offshore Wind Farm - December 2023 Renewables - Wind
Scoping Opinion - Nova Òran na Mara Tidal Energy Project - December 2023 Renewables - Tidal
Scoping Report - Phase 5 Development - Invergordon Service Base - SCOP-0035 Construction, alteration or improvement of any works
Port of Cromarty Firth - Phase 5 Development - Invergordon Service Base Construction, alteration or improvement of any works
Screening Opinion - Loch Ryan Habitat Creation - SCR-0070 Other
Scoping Opinion – Morven Offshore Wind Farm Array Area - November 2023 Renewables - Wind
Scoping - Hunterston Construction Yard Development- Hunterston Construction, alteration or improvement of any works 2023-10-06
Scoping Report- Hunterston Construction Yard Development- Hunterston Construction, alteration or improvement of any works
Hunterston Construction Yard Development- Hunterston Construction, alteration or improvement of any works
Screening - Berthing Quay, East side of Inner Dock - Port of Nigg, Cromarty Firth Construction, alteration or improvement of any works 2023-11-16
Screening Request - Berthing Quay, East side of Inner Dock - Port of Nigg, Cromarty Firth Construction, alteration or improvement of any works
Port of Nigg, Cromarty Firth - Berthing Quay, East side of Inner Dock Construction, alteration or improvement of any works
Environmental Impact Assessment Screening Opinion - Section 36 consent variation - Meygen Tidal Energy Project Area - Inner Sound, Pentland Firth Renewables - Tidal
Pre-Application Consultation - Salamander Offshore Wind Farm - November 2023 Renewables - Wind
Pre-Application Consultation - Salamander Offshore Wind Farm - June 2023 Renewables - Wind
Pre-Application Consultation - Salamander Offshore Wind Farm Renewables - Wind 2023-04-26
Screening Request - Loch Ryan Habitat Creation - SCR-0070
Screening - Loch Ryan Habitat Creation - SCR-0070 Construction, alteration or improvement of any works 2023-10-18
Loch Ryan Habitat Restoration
Screening Opinion - Inch Cape Offshore Windfarm (Revised Design), Firth of Forth - Cofferdam
Scoping - Port Ellen Terminal Development
Scoping Report - Spiorad na Mara Limited - Spiorad na Mara Offshore Windfarm Renewables - Wind
Scoping - Spiorad na Mara Limited - Spiorad na Mara Offshore Windfarm Renewables - Wind 2023-09-29
Screening Opinion - Extension to Sea Wall and Land Reclamation - Atlantis Lodges, Finstown, Orkney - SCR-0067
Screening Opinion - Blackmill Bay Harbour - SCR-0062
Habitats Regulations Appraisal Screening Report - Fall of Warness Tidal Test Site, EMEC Renewables - Tidal
Scoping Report - Buchan Offshore Wind - SCOP-0031 Renewables - Wind
Scoping - Buchan Offshore Wind Farm - SCOP-0031 Renewables - Wind 2023-10-04
Scoping Opinion - Muir Mhor Offshore Windfarm
Scoping Opinion - Port of Leith Outer Berth
Request for Environmental Impact Assessment Screening Opinion - Section 36 consent variation - Meygen Tidal Energy Project Area - Inner Sound, Pentland Firth Renewables - Tidal
MeyGen - Section 36 Consent Variation - Inner Sound, Pentland Firth Renewables - Tidal 2023-09-25
Pre-application Consultation - West of Orkney Windfarm Renewables - Wind
Screening Opinion - Pentland Floating Offshore Wind Farm (Revised Design) Renewables - Wind
Screening - Capital Dredging and Deposit Variation - Ardersier Nairn - SCR-0063 Dredging
Screening Opinion Request - Capital Dredging and Deposit Variation - Ardersier Nairn - SCR-0063 Dredging
Screening Opinion Request - Extension to Sea Wall and Land Reclamation - Atlantis Lodges, Finstown, Orkney - SCR-0067 Construction, alteration or improvement of any works
Screening - Extension to Sea Wall and Land Reclamation - Atlantis Lodges, Finstown, Orkney - SCR-0067 Construction, alteration or improvement of any works
Screening Request – Inch Cape Offshore Windfarm (Revised Design), Forth of Forth – Cofferdam Renewables - Wind
Marine Licence – Inch Cape Offshore Windfarm (Revised Design), Firth of Forth – Cofferdam - 00010690 Renewables - Wind 2024-02-06
Screening - Land Reclamation - Altanavaig Quarry, Kyelakin, Isle of Skye - SCR- 0057 Construction, alteration or improvement of any works 2023-06-27
Screening Opinion - Land Reclamation - Altanavaig Quarry, Kyelakin, Isle of Skye - SCR- 0057
Scoping - Nova Òran na Mara Tidal Energy Project Renewables - Tidal 2023-08-04
Scoping Request - Nova Òran na Mara Tidal Energy Project Renewables - Tidal
Nova Òran na Mara Tidal Energy Project Renewables - Tidal
Screening Opinion - Cumbrae Ferry Slipway Replacement - SCR-0060 Construction, alteration or improvement of any works
Supplementary Screening Information - Capital Dredging and Sea Disposal Variation - Ardersier Port, Moray Firth Construction, alteration or improvement of any works
Screening - Pentland Floating Offshore Wind Farm (Revised Design) Renewables - Wind 2023-08-07
Screening Request - Pentland Floating Offshore Wind Farm (Revised Design) Renewables - Wind
Screening - Capital Dredging and Sea Disposal Variation - Ardersier Port, Moray Firth Dredging 2023-07-07
Screening Opinion Request - Blackmill Bay Harbour
Blackmill Bay Harbour
Screening Opinion Beach Recharge and Dune Restoration - Eden Estuary Sands, St. Andrews - SCR-0059 Other
HRA Screening Report – Morven Offshore Wind Farm Array Area – July 2023 Renewables - Wind
Scoping Report – Morven Offshore Wind Farm Array Area – July 2023 Renewables - Wind
Scoping – Morven Offshore Wind Farm Renewables - Wind 2023-07-17
Scoping Opinion - TotalEnergies - Culzean Floating Wind Pilot Project Renewables - Wind
Screening Report - Tarbert Ferry Terminal Marshalling Area Upgrade Construction, alteration or improvement of any works
Tarbert Ferry Terminal Marshalling Area Upgrade
Screening - Capital Dredging and Sea Disposal Variation - Ardersier Port, Moray Firth Construction, alteration or improvement of any works
Port of Leith - Scoping Report Construction, alteration or improvement of any works
Stromar Offshore Wind Farm Renewables - Wind
Habitats Regulations Appraisal Screening Report - Muir Mhòr Offshore Wind Farm, East Coast of Peterhead Renewables - Wind
Scoping Report - Muir Mhòr Offshore Wind Farm, East Coast of Peterhead Renewables - Wind
Scoping - Muir Mhòr Offshore Wind Farm, East Coast of Peterhead Renewables - Wind
Screening Opinion Request - Land Reclamation - Altanavaig Quarry, Kyelakin, Isle of Skye - SCR- 0057 Construction of new works
Screening - Cumbrae Ferry Slipway Replacement - SCR-0060 Construction, alteration or improvement of any works 2023-06-01
Screening Request - Cumbrae Ferry Slipway Replacement - SCR-0060 Construction, alteration or improvement of any works
Scoping Opinion - Cenos Offshore Windfarm Renewables - Wind
Scoping Opinion - Salamander Offshore Wind Farm Renewables - Wind
Scoping Opinion - Ossian Offshore Wind Farm Renewables - Wind
Screening Request - Beach Recharge and Dune Restoration - Eden Estuary Sands, St. Andrews - SCR-0059 Deposit of any substance or object 2023-05-03
Screening Request - Beach Recharge and Dune Restoration - Eden Estuary Sands, St. Andrews - SCR-0059
Eden Estuary Sands, St. Andrews - Beach Recharge and Dune Restoration
Scoping Request - Harbour Energy Plc - Central North Sea Electrification ("CNSE") Project Cable
Scoping - Harbour Energy Plc - Central North Sea Electrification ("CNSE") Project Cable 2023-05-25
Habitats Regulations Appraisal Screening Report Response – Cambois Cable Connection - Berwick Bank Offshore Wind Farm, Firth of Forth Cable
Marine Licence Pre-Application Consultation - Salamander Offshore Wind Farm Renewables - Wind
Muir Mhòr Offshore Wind Farm Renewables - Wind
Central North Sea Electrification ("CNSE") Project Construction of new works
European Protected Species Licence – Geophysical Surveys - Longhaven and Sandford Bay - 00010349 Construction of new works 2023-05-09 2023-06-01
Screening Opinion - Lochmaddy Ferry Terminal Development - Dredging - SCR-0056 Dredging
Scoping Opinion - MarramWind Offshore Wind Farm - SCOP-0020 Renewables - Wind
Screening Opinion - Lobnitz Dock Infilling – Clyde Waterfront Renfrew Riverside (CWRR), Glasgow Construction, alteration or improvement of any works
Morven Offshore Wind Farm Renewables - Wind
Scoping Report - TotalEnergies - Culzean Floating Wind Pilot Project Renewables - Wind
Culzean Floating Wind Pilot Project Renewables - Wind
Screening Opinion - Lochmaddy Ferry Terminal Development - Dredging - SCR-0056 Dredging 2023-04-05
Screening Opinion Request - Lochmaddy Ferry Terminal Development - Dredging - SCR-0056 Dredging
Habitats Regulations Appraisal Screening Report – Cambois Cable Connection - Berwick Bank Offshore Wind Farm, Firth of Forth Renewables - Wind
Thistle Wind Partners Limited (NE2) Renewables - Wind
Spiorad na Mara Renewables - Wind
Screening Opinion - Inch Cape Offshore Windfarm (Revised Design) - Firth of Forth – Additional Landfall Works Renewables - Wind
Buchan Offshore Wind Renewables - Wind
Cenos Offshore Windfarm Renewables - Wind
Scoping - Flotation Energy Ltd - Cenos Offshore Windfarm Renewables - Wind 2023-02-24
Scoping Request - Cenos Offshore Windfarm Renewables - Wind
HRA Screening Report - Ossian Offshore Wind Farm Renewables - Wind
Scoping Report - Ossian Offshore Wind Farm Renewables - Wind
Scoping - Ossian offshore Wind Farm Renewables - Wind 2023-03-09
Habitats Regulations Appraisal Screening Report - Salamander Offshore Wind Farm Renewables - Wind
Scoping Report - Salamander Offshore Wind Farm Renewables - Wind
Screening Opinion - Acairsaid Pier, Eriskay - SCR-0052 Construction of new works
Inch Cape Offshore Windfarm (Revised Design), Firth of Forth - Proposed Variation to Offshore Transmission Works Marine Licence - Screening Opinion Renewables - Wind
Scoping Opinion - Cambois Cable Connection - Berwick Bank Offshore Wind Farm, Firth of Forth Cable
Marine Licence - Marina Construction - Catfirth, Nesting, Shetland - Scoping Report Construction of new works
Marine Licence - Marina Construction - Catfirth, Nesting, Shetland Construction of new works 2022-10-28
Scoping Report - MarramWind Offshore Wind Farm - SCOP-0020 Renewables - Wind
Scoping - MarramWind Offshore Wind Farm - SCOP-0020 Renewables - Wind 2023-01-26
Scoping Opinion - Stranraer Marina Development - Stranraer, Dumfries and Galloway Construction, alteration or improvement of any works
Scoping Opinion - Fair Isle Harbour Improvement Works - Fair Isle Construction, alteration or improvement of any works
Scoping - Fair Isle Harbour Improvement Works - Fair Isle Construction, alteration or improvement of any works 2022-06-09
MarramWind Offshore Wind Farm Renewables - Wind
Inch Cape Offshore Windfarm (Revised Design), Firth of Forth - Additional Landfall Works - Screening Request Renewables - Wind
Fair Isle Harbour Improvement Works Maintenance of existing works
Screening Opinion - Harbour Improvement Works - Colonsay - SCR-0051 Construction, alteration or improvement of any works
Screening Report - Acairsaid Pier, Eriskay - SCR-0052 Construction, alteration or improvement of any works
Screening -Acairsaid Pier, Eriskay - SCR-0052 Construction, alteration or improvement of any works 2022-11-22
Scoping Opinion - Caledonia Offshore Wind Farm - Moray Firth Renewables - Wind
Screening Opinion - Granton Harbour Redevelopment - SCR-0048 Construction, alteration or improvement of any works
Inch Cape Offshore Windfarm (Revised Design), Firth of Forth - Proposed Variation to Offshore Transmission Works Marine Licence - Screening Request Renewables - Wind
Screening - Inch Cape Offshore Windfarm (Revised Design), Firth of Forth - Variation to OFTW marine licence 2023 Renewables - Wind 2022-12-15
Scoping Opinion - Fall of Warness Tidal Test Site, EMEC Renewables - Tidal
Scoping - Berwick Bank Offshore Wind Farm Cambois Connection - Firth of Forth Cable
HRA Screening Report - Offshore Wind Power Ltd - West of Orkney Windfarm Renewables - Wind
HRA Screening - Offshore Wind Power Ltd - West of Orkney Windfarm Renewables - Wind
HRA Screening Response - Offshore Wind Power Ltd - West of Orkney Windfarm Renewables - Wind
Scoping Report - Cambois Cable Connection - Berwick Bank Offshore Wind Farm, Firth of Forth Cable
Screening Opinion Request - Harbour Improvement Works - Colonsay - SCR-0051 Construction, alteration or improvement of any works
Screening Opinion - Harbour Improvement Works - Colonsay - SCR-0051 Construction, alteration or improvement of any works 2022-11-08
Colonsay Ferry Terminal Upgrade Construction, alteration or improvement of any works
Screening Opinion - Invercoe Caravan Park - SCR-0046 Construction, alteration or improvement of any works
Screening Request - Granton Harbour Redevelopment - SCR-0048 Construction, alteration or improvement of any works
Screening - Granton Harbour Redevelopment - SCR-0048 Construction, alteration or improvement of any works 2022-09-28
HRA Screening Report - Caledonia Offshore Wind Farm - Moray Firth Renewables - Wind
HRA Screening - Caledonia Offshore Wind Farm - Moray Firth Renewables - Wind 2022-10-03
Scoping Report - Caledonia Offshore Wind Farm - Moray Firth Renewables - Wind
Scoping - Caledonia Offshore Wind Farm - Moray Firth Renewables - Wind 2022-09-30
Inch Cape Offshore Windfarm (Revised Design), Firth of Forth – Proposed Variation – Screening Opinion Renewables - Wind
Salamander Offshore Wind Farm Renewables - Wind
Screening Request - Invercoe Caravan Park - SCR-0046 Construction, alteration or improvement of any works
Screening - Invercoe Caravan Park - SCR-0046 Construction, alteration or improvement of any works 2022-08-12
Screening Opinion - Replacement Seawall - Largs Bay, Largs, North Ayrshire Construction, alteration or improvement of any works
Pre-Application Consultation – Green Volt Offshore Wind Farm – East of Aberdeenshire Coast Renewables - Wind 2022-08-03
Pre-Application Consultation – Green Volt Offshore Wind Farm – East of Aberdeenshire Coast Renewables - Wind
Marine Licence – Construction of High Voltage Direct Current cable and cable protection – Shetland to Yell Cable
Scoping - Advice on Proposed Content of the Assessment to Support a Marine Licence Application - Construction of High Voltage Direct Current cable and cable protection - Shetland to Yell Cable
Screening Opinion – Govan Basin Infill – SCR-0043
Screening Opinion - Section 36 Consent Variation - Fall of Warness Tidal Test Site, EMEC Renewables - Tidal
Screening Opinion – Capital Dredging and Sea Disposal – Ardersier Port, Moray - SCR-0040 Dredging
Caledonia Offshore Wind Farm Renewables - Wind
Inch Cape Offshore Windfarm (Revised Design), Firth of Forth – Proposed Variation – Screening Request and Report Renewables - Wind
Section 36 consent and Generating Station marine licence variation – Inch Cape Offshore Windfarm (Revised Design), Firth of Forth – Variation of turbine spacing and design parameters Renewables - Wind 2022-07-04
Scoping Opinion - West of Orkney Windfarm Renewables - Wind
Scoping Opinion Request - West of Orkney Wind Farm - West of Hoy, Orkney Renewables - Wind 2022-03-02
Screening Response - Nature Conservation Appraisal Report – Pentland Offshore Wind Farm, Dounreay, Caithness Renewables - Wind
Screening – Nature Conservation Appraisal Report – Pentland Offshore Wind Farm, Dounreay, Caithness Renewables - Wind 2022-02-22
Scoping Report - Fair Isle Harbour Improvement Works - Fair Isle Construction, alteration or improvement of any works
Scoping Report - Fair Isle Harbour Improvement Works - Fair Isle Construction, alteration or improvement of any works 2022-06-09
Screening - Capital Dredging and Sea Disposal - Ardersier Port, Moray Firth - June 2022 Other dredging
Screening Opinion- Ferry Terminal Redevelopment- Gourock- SCR-0029 Construction, alteration or improvement of any works
Scoping Report - Fall of Warness Tidal Test Site, EMEC Renewables - Tidal
Section 36 Consent (new proposal) - Fall of Warness Tidal Test Site, EMEC Renewables - Tidal
Screening Opinion - Alternative Landfall Cable Installation Method – Cockenzie, East Lothian Cable
Screening Request - Alternative Landfall Cable Installation Method – Cockenzie, East Lothian Cable
Screening Opinion- Harbour Improvement Works - Grutness, Shetland Construction, alteration or improvement of any works
Pre-Application Consultation Report - Outer Berth Construction, Capital Dredging and Sea Deposit - Port Of Leith Construction, alteration or improvement of any works
Pre-Application Consultation Report - Harbour Development - Staffin, Skye Construction, alteration or improvement of any works
Screening Request - Govan Basin Infill - SCR-0043 Construction, alteration or improvement of any works
Screening - Govan Basin Infill - SCR-0043 Construction, alteration or improvement of any works 2022-05-20
Scoping Opinion - Iona Harbour Redevelopment - Iona Harbour, Sound of Iona Construction, alteration or improvement of any works
Screening Request - Section 36 Consent Variation - Fall of Warness Tidal Test Site, EMEC Renewables - Tidal
Screening Request - Harbour Improvement Works - Grutness, Shetland Construction, alteration or improvement of any works
Screening Opinion - HT1 Hydrogen Electrolyser Project - European Offshore Wind Deployment Centre, Aberdeen Bay Renewables - Wind
Screening Opinion - Granton Harbour Redevelopment - SCR-0041 Construction, alteration or improvement of any works
Marine Licence -Replacement Seawall - Largs Bay , Largs, North Ayrshire Construction, alteration or improvement of any works 2021-11-30
Screening request - Replacement Seawall - Largs Bay, Largs, North Ayrshire Construction, alteration or improvement of any works
Bowling Remediation Project - Pre-Application Consultation Public Notice Construction, alteration or improvement of any works
Screening Request - Section 36 Consent Variation - Seagreen Alpha and Bravo Wind Farm, Firth of Forth Renewables - Wind
Screening Opinion - Section 36 Consent Variation - Seagreen Alpha and Bravo Wind Farm, Firth of Forth Renewables - Wind
Screening Opinion - Leith Outer Berth Construction, alteration or improvement of any works
Scoping Opinion "Addendum" - Pentland Floating Offshore Wind Farm Renewables - Wind
Scoping Request - Stranraer Marina Development - Stranraer, Dumfries and Galloway Construction, alteration or improvement of any works
Scoping - Stranraer Marina Development - Stranraer, Dumfries and Galloway Construction, alteration or improvement of any works 2022-04-21
Screening Request - Granton Harbour Redevelopment - SCR-0041 Construction, alteration or improvement of any works
Screening - Granton Harbour Redevelopment - SCR-0041 Construction, alteration or improvement of any works 2022-05-09
Screening Request May 2022 – Capital Dredging and Sea Disposal – Ardersier Port, Moray Firth Dredging
Screening Request - Gourock Ferry Terminal Redevelopment - SCR-0029 Construction, alteration or improvement of any works
Screening - Gourock Ferry Terminal Redevelopment - SCR-0029 Construction, alteration or improvement of any works 2022-04-22
Screening Opinion - Section 36 Consent and Marine Licence Variation - Seagreen Alpha and Bravo Offshore Wind Farm – Firth of Forth Renewables - Wind
Screening Request - Section 36 Consent and Marine Licence Variation - Seagreen Alpha and Bravo Offshore Wind Farm – Firth of Forth Renewables - Wind
Screening – Section 36 Consent and Marine Licence Variation - Seagreen Alpha and Bravo Offshore Wind Farm – Firth of Forth Renewables - Wind 2022-01-17
Pre-Application Consultation Advert - Algal Farm - St Andrews Bay, Fife Macroalgae
Pre-Application Consultation - Algal Farm - St Andrews Bay, Fife Macroalgae 2022-04-15
Scoping Opinion – Green Volt Offshore Wind Farm – East of Aberdeenshire Coast Renewables - Wind
Pre-Application Consultation - Pentland Floating Offshore Wind Farm - Dounreay, Caithness - May 2022 Renewables - Wind
Pre-Application Consultation Advert - Discharge Pipeline - Spey Bay Construction, alteration or improvement of any works
Pre-Application Consultation - Discharge Pipeline - Spey Bay Construction, alteration or improvement of any works 2022-04-12
Pre-Application Consultation - Cable Works - Scotland to England Green Link 2, Sandford Bay, Peterhead to Fraisthorpe Sands, England Cable
Scoping - Offshore Wind Power Ltd - West of Orkney Wind Farm Renewables - Wind 2022-03-02
Pre-Application Consultation Event - Algal Farm - Camas na Airigh Macroalgal farm
Pre-Application Consultation - Algal Farm - Camas na Airigh Macroalgal farm
Decommissioning Programme - Tidal Farm - Sound of Islay Renewables - Tidal
Marine Licence - Tidal Farm - Sound of Islay Renewables - Tidal 2022-03-18
Flex Marine Power Ltd
Scoping Request - Offshore Wind Power Limited - West of Orkney Renewables - Wind
Pre-Application Consultation - Cable Works - Peterhead to Fraisthorpe Sands Cable
Screening Opinion - Dounreay Tri Floating Wind Demonstration Project - Dounreay, Caithness Renewables - Wind
Screening Opinion- Riverbank Protection Works- Barra Airport, Barra- SCR-0032 Construction, alteration or improvement of any works
Marine Licence Variation - Construction - Nigg Energy Park East Quay - 00009721 Construction, alteration or improvement of any works
Screening Opinion - Ardersier Port Development Dredge Licence Variation Other dredging
Pre-Application Consultation - Cable Installation - Thorntonloch beach, East Lothian Cable
Pre-Application Consultation - Cable Installation - Thorntonloch beach, East Lothian Cable 2022-01-11
Scoping Opinion - Fionnphort Harbour Redevelopment - Fionnphort Harbour, Sound of Iona Construction, alteration or improvement of any works
Screening Request - Section 36 and Marine Licence Variation - Seagreen Alpha and Bravo Offshore Wind Farms, Firth of Forth Renewables - Wind
Pre-Application Consultation - Algal Farm - Gairloch, Highlands Macroalgal farm
Pre-Application Consultation - Algal Farm - Gairloch, Highlands Macroalgal farm 2022-01-31
Screening - Dounreay Tri Floating Wind Demonstration Project - Dounreay, Caithness Renewables - Wind 2021-12-10
Screening Request - Dounreay Tri Floating Wind Demonstration Project - Dounreay, Caithness Renewables - Wind
Scoping Request "Addendum" - Pentland Floating Offshore Wind Farm Renewables - Wind
Scoping Opinion - Forthwind Offshore Wind Demonstration Project - Methil, Firth of Forth Renewables - Wind
Port of Leith Outer Berth - Screening Report and Screening HRA Report Construction, alteration or improvement of any works
Screening Request - Construction of Coast Protection - Barra Airport Construction of new works
Lochmaddy Ferry Terminal Development - Licence Variation Screening Opinion Other
Screening Opinion Request 2021 - Nigg East Quay Dredging
Scoping Request - Green Volt Floating Offshore Wind Farm - East of Aberdeenshire Coast Renewables - Wind
Screening - HT1 Hydrogen Electrolyser Project - European Offshore Wind Deployment Centre, Aberdeen Bay Renewables - Wind 2021-11-06
Screening Request - HT1 Hydrogen Electrolyser Project - European Offshore Wind Deployment Centre, Aberdeen Bay Renewables - Wind
Screening - Capital Dredging and Sea Disposal - Ardersier Port, Moray Firth Dredging 2021-11-05
Screening Request - Capital Dredging and Sea Disposal - Ardersier Port, Moray Firth Dredging
Screening Request - Lochmaddy Ferry Terminal Development - Loch Maddy, North Uist Construction, alteration or improvement of any works
Scoping Opinion - Hatston Pier and Terminal Expansion - Hatston, Orkney Construction of new works
Scoping Opinion - Scapa Deep Water Quay - Scapa Flow, Orkney Construction of new works
Scoping - Scapa Deep Water Quay - Scapa Flow, Orkney Construction of new works 2020-07-01
Iona Harbour Redevelopment Construction, alteration or improvement of any works
Fionnphort Harbour Redevelopment Construction, alteration or improvement of any works
Pre-Application Consultation - Revetment and Land Reclamation - Ardrossan North Shore Construction, alteration or improvement of any works
Pre-Application Consultation - Revetment and Land Reclamation - Ardrossan North Shore Construction, alteration or improvement of any works 2021-10-19
Scoping Opinion - Pentland Floating Offshore Wind Farm Renewables - Wind
Screening opinion - Construction of Coastal Protection - Stornoway Airport, Isle of Lewis - 00009183 Construction, alteration or improvement of any works
Marine Licence - Construction of Coastal Protection - Stornoway Airport, Isle of Lewis - 00009183 Construction of new works
Pre-Application Consultation - Pentland Floating Offshore Wind Farm - Dounreay, Caithness Renewables - Wind 2021-08-17
Pre-Application Consultation - Pentland Floating Offshore Wind Farm - Dounreay, Caithness Renewables - Wind
Scoping Request- Forthwind Offshore Wind Demonstration Project - Methil, Firth of Forth Renewables - Wind
Scoping - Forthwind Offshore Wind Demonstration Project - Methil, Firth of Forth Renewables - Wind 2021-08-04
Marine Licence - Fionnphort Harbour Redevelopment - Fionnphort Harbour, Sound of Iona Construction, alteration or improvement of any works 2021-08-20
Scoping Report - Fionnphort Harbour Redevelopment - Fionnphort Harbour, Sound of Iona Construction, alteration or improvement of any works
Scoping - Iona Harbour Redevelopment - Iona Harbour, Sound of Iona Construction, alteration or improvement of any works 2021-08-20
Scoping Report - Iona Harbour Redevelopment - Iona Harbour, Sound of Iona Construction, alteration or improvement of any works
Marine Licence - Bridge and Rock Revetment Reconfiguration - Broughty Ferry Construction, alteration or improvement of any works 2021-08-13
Pre-Application Consultation Notification - Bridge and Rock Revetment Reconfiguration - Broughty Ferry Construction, alteration or improvement of any works
Screening Opinion - Construction of a Pontoon and Capital Dredging and Sea Deposit of Dredge Material - Port Edgar Marina Construction, alteration or improvement of any works
Pre-Application Consultation - Coastal Flood Defences - Millport, North Ayrshire Construction, alteration or improvement of any works
Marine Licence - Coastal Flood Defences - Millport, North Ayrshire Construction, alteration or improvement of any works 2021-07-22
Screening Opinion - Pier Demolition - Brodick Pier, Arran Construction, alteration or improvement of any works
Report on Proposed Content of the Assessment to Support a Marine Licence Application Cable
Screening Opinion - Splay Berth Deepening - Mallaig Harbour Construction, alteration or improvement of any works
Screening Request - Harbour Repairs - Kennacraig, Argyll and Bute Maintenance of existing works
Screening Request - Harbour Refurbishments - Port Ellen, Argyll and Bute Maintenance of existing works
Port Ellen Terminal Development Maintenance of existing works
Kennacraig Harbour Repairs Maintenance of existing works
Screening request 2021 - Aberdeen Harbour Expansion Project Construction, alteration or improvement of any works
Pre-Application Consultation - Cable Works - Inner Hebrides and Shetland Cable
Pre-Application Consultation - Cable Works - Inner Hebrides and Shetland Cable 2021-06-15
Marine Licence - R100 Telecommunication Cables - Orkney, Shetland and Hebrides Cable 2021-06-08
Pre-Application Consultation - R100 Telecommunication Cables - Orkney, Shetland and Hebrides Cable
Screening Request – Pier Demolition – Brodick Pier, Arran Construction, alteration or improvement of any works
Screening – Pier Demolition – Brodick Pier, Arran Construction, alteration or improvement of any works 2021-05-06
Screening Request - Splay Berth Deepening - Mallaig Harbour Construction, alteration or improvement of any works
Screening - Splay Berth Deepening - Mallaig Harbour Construction, alteration or improvement of any works 2021-05-06
HRA Screening Report Response – Berwick Bank Offshore Wind Farm Renewables - Wind
Habitats Regulations Appraisal - Screening Report Response - Berwick Bank Offshore Wind Farm - Firth of Forth Renewables - Wind
Advice on the Proposed Content of the Assessment to Support a Marine Licence Application Construction, alteration or improvement of any works
Scoping Request - Scapa Deep Water Quay - Scapa Flow, Orkney Construction, alteration or improvement of any works
Scoping Request - Hatston Pier and Terminal Expansion - Hatston, Orkney Construction, alteration or improvement of any works
Scoping - Hatston Pier and Terminal Expansion - Hatston, Orkney Construction, alteration or improvement of any works 2020-07-01
Screening Opinion - Construction of a Rock Armour Revetment - Esso Distribution Terminal, Bowling Construction, alteration or improvement of any works
Screening – Pier Extension and Breakwater Construction – Ulva Pier, Isle of Mull – 00009230 Construction, alteration or improvement of any works
Screening Opinion - Watercourse Protection - Glencloy Water, Arran - 00008920 Construction, alteration or improvement of any works
Screening Request - Ulva Pier Redevelopment - Ulva, Isle of Mull Construction, alteration or improvement of any works 2021-01-15
Screening Request - Construction of a Rock Armour Revetment - Esso Distribution Terminal, Bowling Construction, alteration or improvement of any works
Screening - Construction of a Rock Armour Revetment - Esso Distribution Terminal, Bowling Construction, alteration or improvement of any works
Scoping Opinion – Berwick Bank Offshore Wind Farm - Firth of Forth Renewables - Wind
Marine Licence - Slipway Upgrade - Staffin Community Harbour, Isle of Skye Construction, alteration or improvement of any works 2021-02-19
Pre-Application Consultation - Slipway Upgrade - Staffin Community Harbour, Isle of Skye Construction, alteration or improvement of any works
Marine Licence - Caol Transfer Outfall Pipe Replacement - Loch Linnhe, Fort William Construction, alteration or improvement of any works 2021-03-02
Pre-Application Consultation - Caol Transfer Outfall Pipe Replacement - Loch Linnhe, Fort William Construction, alteration or improvement of any works
Section 36 Consent Variation - Moray West Offshore Windfarm, Moray Firth - Screening Opinion Renewables - Wind
Pre-Application Consultation Advert- Installation of Submarine Cable - Kilbrannan Sound Cable
Pre-Application Consultation - Installation of Submarine Cable - Kilbrannan Sound Cable 2021-02-25
Pre-Application Consultation Advert - Construction of an Outfall Pipe - Loch Linnhe, Fort William Construction, alteration or improvement of any works
Pre-Application Consultation - Construction of an Outfall Pipe - Loch Linnhe, Fort William Construction, alteration or improvement of any works 2021-02-25
Pre-Application Consultation - Submarine Electricity Cable - Ard Beag, Skye to Loch Gheocrab, Harris Cable
Marine Licence - Submarine Electricity Cable - Ard Beag, Skye to Loch Gheocrab, Harris Cable 2021-02-22
Screening Opinion – Seagreen 1A Export Cable Corridor Renewables - Wind
Screening Opinion - Iona and Fionnphort Brekwaters and Berth Construction, alteration or improvement of any works
Marine Licence - Scour Repairs - Kiachnish Bridge, Highlands Maintenance of existing works 2021-03-02
Pre-Application Consultation Notification - Scour Repairs - Kiachnish Bridge, Highlands Maintenance of existing works
Screening Opinion - Stranraer Marine Development - Stranraer Marina Construction, alteration or improvement of any works
Screening Opinion - Watercourse Protection - Glencloy Water, Arran Construction, alteration or improvement of any works
Screening - Watercourse Protection - Glencloy Water, Arran Construction, alteration or improvement of any works 2021-02-02
Pre-Application Consultation Report - Pontoons - Eyemouth Harbour, Borders - 00009078 Renewables - Wind
Notice of Pre-application Consultation - Algal Farm - Loch Melfort Macroalgae
Pre-application Consultation - Algal Farm - Loch Melfort Macroalgae 2021-01-05
Pre-Application Consultation – Construction of export cable – Firth of Forth Renewables - Wind
Marine licence – Construction of export cable – Firth of Forth Renewables - Wind 2021-01-07
Scoping Request - Pentland Floating Offshore Wind Farm Renewables - Wind
Seagreen 1A Export Cable Corridor Renewables - Wind
Screening Request - Seagreen 1A Export Cable Corridor Construction, alteration or improvement of any works
Screening – Iona Breakwater with Berth and Fionnphort Breakwater with Overnight Berth – Iona and Fionnphort Construction, alteration or improvement of any works 2020-12-08
Screening Request – Fionnphort Breakwater and Overnight Berth Construction, alteration or improvement of any works
Screening Request – Iona Breakwater and Berth Construction, alteration or improvement of any works
Consultation Responses - Lobnitz Dock Infilling – Clyde Waterfront Renfrew Riverside (CWRR), Glasgow Construction, alteration or improvement of any works
Lobnitz Dock Infilling – Clyde Waterfront Renfrew Riverside (CWRR), Glasgow Construction, alteration or improvement of any works 2020-12-02
Screening Variation Request - Nigg East Quay Development Construction, alteration or improvement of any works
Screening Request - Stranraer Marine Development - Stranraer Marina Construction, alteration or improvement of any works
Marine Licence - Stranraer Marine Development - Stranraer Marina Construction, alteration or improvement of any works 2020-11-20
Habitats Regulations Appraisal Screening Report – Berwick Bank Offshore Wind Farm - Firth of Forth Renewables - Wind
Screening Opinion - A82 Croit Anna to Caledonia Seawall Construction - Lochaber, Highlands Construction, alteration or improvement of any works
Screening Consultation Responses - Blade Width Increase and Generating Capacity Alteration - Moray West Offshore Windfarm Renewables - Wind
Screening Opinion - Replacement Fixed Crossing - Bernera Bridge, Western Isles Construction, alteration or improvement of any works
Screening Request - Replacement Fixed Crossing - Bernera Bridge, Western Isles Construction, alteration or improvement of any works
Marine Licence - Replacement Fixed Crossing - Bernera Bridge, Western Isles Construction, alteration or improvement of any works 2020-10-08
Screening Opinion - New Quay - Windmill Croft Quay - River Clyde Construction, alteration or improvement of any works
Screening - Variation to offshore transmission works marine licence - Neart na Gaoithe Offshore Wind Farm (Revised Design) - 06678 Renewables - Wind
Screening - Clyde Waterfront Renfrew Riverside (CWRR) Construction, alteration or improvement of any works 2020-09-09
Screening Request - Clyde Waterfront Renfrew Riverside (CWRR) Construction, alteration or improvement of any works
Screening Request - Blade Width Increase and Generating Capacity Alteration - Moray West Offshore Windfarm Renewables - Wind
Scoping Report - Berwick Bank Offshore Wind Farm - Firth of Forth Renewables - Wind
Screening Request - New Quay – Windmill Croft Quay – River Clyde Construction, alteration or improvement of any works
Screening - New Quay - Windmill Croft Quay - River Clyde Construction, alteration or improvement of any works 2020-08-07
Pre-Application Consultation - Land Reclamation for Laydown Area Extension - Kishorn Port Construction, alteration or improvement of any works 2020-08-03
Pre-Application Consultation – Land Reclamation for Laydown Area Extension - Kishorn Port Other
Screening Request - Scapa Pier Enhancements - Scapa Flow, Orkney Construction, alteration or improvement of any works
Screening Opinion - Scapa Pier Enhancements - Scapa Flow, Orkney Construction, alteration or improvement of any works
Screening - Scapa Pier Enhancements - Scapa Flow, Orkney Construction, alteration or improvement of any works 2020-07-01
Scapa Pier Enhancements Construction, alteration or improvement of any works
Screening Request - Scapa Deep Water Quay - Scapa Flow, Orkney Construction of new works
Screening Opinion - Scapa Deep Water Quay - Scapa Flow, Orkney Construction of new works
Screening - Scapa Deep Water Quay - Scapa Flow, Orkney Construction of new works 2020-07-01
Scapa Deep Water Quay Construction, alteration or improvement of any works
Screening Request - Kirkwall Pier and Harbour Enhancements - Kirkwall, Orkney Construction, alteration or improvement of any works
Screening Opinion - Kirkwall Pier and Harbour Enhancements - Kirkwall, Orkney Construction, alteration or improvement of any works
Screening - Kirkwall Pier and Harbour Enhancements - Kirkwall, Orkney Construction, alteration or improvement of any works 2020-07-01
Kirkwall Pier and Harbour Enhancements Construction, alteration or improvement of any works
Screening Opinion - Hatston Pier and Terminal Expansion - Hatston, Orkney Construction, alteration or improvement of any works
Screening Request - Hatston Pier and Terminal Expansion - Hatston, Orkney Construction, alteration or improvement of any works
Screening - Hatston Pier and Terminal Expansion - Hatston, Orkney Construction, alteration or improvement of any works 2020-07-01
Hatston Pier and Terminal Expansion Construction, alteration or improvement of any works
Screening Opinion - Construction of a Pontoon and Capital Dredging and Sea Deposit of Dredge Material - Port Edgar Marina Construction, alteration or improvement of any works
Screening Opinion - Land Reclamation for Laydown Area Extension - Kishorn Port Other deposits
Pre-Application Consultation - Algal Farm - South Pabay, Isle of Skye Macroalgae
Pre-Application Consultation - Algal Farm - South Pabay, Isle of Skye Macroalgal farm 2020-05-27
Pre-application Consultation Notices during COVID-19
Screening Opinion - Shore Street Widening & Promenade - Ullapool, Ross and Cromarty Construction, alteration or improvement of any works
Screening Opinion - Dredging and Reclamation - Robertson Metals Recycling, Inverkeithing Dredging
Screening Opinion - Breakwater construction and land reclamation - Cullivoe Pier, North Yell Construction, alteration or improvement of any works
Screening - Breakwater construction and land reclamation - Cullivoe Pier, North Yell Construction, alteration or improvement of any works 2020-04-15
Screening Request – Kishorn Port Construction, alteration or improvement of any works
Kishorn Port Land Reclamation for Laydown Area Construction, alteration or improvement of any works
Screening – Land Reclamation for Laydown Area - Kishorn Port Construction, alteration or improvement of any works 2020-03-30
Screening Request - Shore Street Widening & Promenade - Ullapool, Ross and Cromarty Construction, alteration or improvement of any works
Screening - Shore Street Widening & Promenade - Ullapool, Ross and Cromarty Construction, alteration or improvement of any works 2020-03-16
Screening Request - Construction of a Pontoon and Capital Dredging and Sea Deposit of Dredge Material - Port Edgar Marina Construction, alteration or improvement of any works 2020-03-12
Screening Request - Port Edgar Marina Construction, alteration or improvement of any works
Screening Opinion - Construction Yard Redevelopment - Hunterston, North Ayrshire Construction, alteration or improvement of any works
Marine Licence - Construction of a New Marina - Cullivoe Pier, North Yell Construction, alteration or improvement of any works 2020-02-04
Screening Request - Construction of a New Marina - Cullivoe Pier, North Yell Construction, alteration or improvement of any works
Grangemouth Flood Defence Works - Scoping Opinion Construction, alteration or improvement of any works
Screening Request - Inverkeithing Dredging and Reclamation Dredging
Screening Request - Dredging and Reclamation - Robertson Metals Recycling, Inverkeithing Dredging 2020-01-23
Screening Opinion - Redevelopment of Dundee East - Port of Dundee Construction, alteration or improvement of any works
Screening Extension Notice Four Construction, alteration or improvement of any works
Marine Scotland Response to Friends of the Firth of Clyde - Hunterston Marine Construction Yard Redevelopment Construction, alteration or improvement of any works
Scoping Report - (Offshore Transmission Infrastructure, cables and substations) -Moray East Offshore Wind Farm Renewables - Wind
Pre-Application Consultation Report - Construction & Operation of Generating Station and Transmission Works - Beatrice Offshore Wind Farm, Moray Firth Renewables - Wind
Pre Application Consultation Report - Moray East Offshore Wind Farm - Moray East, Outer Moray Firth Renewables - Wind
Scoping Report - Construction and Operation of Offshore Transmission Infrastructure - Moray East Offshore Wind Farm Renewables - Wind
Scoping Opinion - Modified Offshore Transmission Infrastructure - Moray East Offshore Wind Farm Renewables - Wind
Scoping Report - Construction and Operation of Generating Station - Moray East Offshore WInd Farm Renewables - Wind
Scoping Opinion- Construction and Operation of Generating Station - Moray East Offshore Wind Farm Renewables - Wind
Scoping Opinion 2019 - Forthwind LTD Offshore Wind Demonstration Project Renewables - Wind
Supplementary Information - Hunterston Marine Construction Yard Redevelopment - Hunterston, North Ayrshire (2019) Construction, alteration or improvement of any works
Scoping - Neart na Gaoithe Renewables - Wind
Screening Opinion - Shetland Tidal Array (as extended) – Bluemull Sound, Shetland Renewables - Tidal
Screening Opinion Request - Redevelopment of Dundee East - Port of Dundee Construction, alteration or improvement of any works
Habitats Regulation Appraisal - Redevelopment of Dundee East - Port of Dundee Construction, alteration or improvement of any works
Further Information - Redevelopment of Dundee East - Port of Dundee Construction, alteration or improvement of any works
Map - Redevelopment of Dundee East - Port of Dundee Construction, alteration or improvement of any works
Diagrams - Redevelopment of Dundee East - Port of Dundee Construction, alteration or improvement of any works
Best Practical Environmental Option Report - Redevelopment of Dundee East - Port of Dundee Construction, alteration or improvement of any works
Marine Licence - Redevelopment of Dundee East - Port of Dundee Construction, alteration or improvement of any works 2019-10-29
Scoping Report - MeyGen Tidal Energy Project - Inner Sound, Pentland Firth Renewables - Tidal
Scoping Opinion - MeyGen Tidal Energy Project - Inner Sound, Pentland Firth Renewables - Tidal
Lochmaddy - 07000/07001 - Scoping Opinion Construction, alteration or improvement of any works
Lochmaddy - 07000/07001 - Screening Opinion Construction, alteration or improvement of any works
Dounreay Trì Floating Wind Demonstration Project - PAC Report Renewables - Wind
Dounreay Trì Floating Wind Demonstration Project - Scoping Opinion Renewables - Wind
Dounreay Trì Floating Wind Demonstration Project - Scoping Report Renewables - Wind
Sea Wall Repair and Extension – Alexandra Parade, Peterhead Construction, alteration or improvement of any works 2019-08-27
Sea Wall repair and Extension - Alexandra parade, Peterhead - Screening Opinion Construction, alteration or improvement of any works
Screening Extension Notice Three Construction, alteration or improvement of any works
Screening Extension Notice Two Construction, alteration or improvement of any works
Screening Extension Notice One Construction, alteration or improvement of any works
Grangemouth Flood Defence - Appendix B Construction, alteration or improvement of any works
Grangemouth Flood Defence - Appendix A Construction, alteration or improvement of any works
Grangemouth Flood Defence Works Construction, alteration or improvement of any works
Hunterston Marine Construction Yard - 2017 Screening Opinion Construction, alteration or improvement of any works
Forth Rail Bridge access system and walkway - Screening Opinion Construction, alteration or improvement of any works
SIMEC GHR LTD - New Landing Facility - Loch Etive, Argyll & Bute Construction of new works
06963 - Appendix B to report Construction of new works
06963 - Appendix A to report Construction of new works
06963 - Screening Report Construction of new works
Capital Dredging & Dredged Spoil Deposit - Phase 4 Development Variation, Invergordon Service Base - 06709 - Screening Opinion Request Dredging
Capital Dredging & Dredged Spoil Deposit - Phase 4 Development Variation, Invergordon Service Base - 06709 - Screening Opinion Dredging
Scoping Opinion - Deep Water Port - Glumaig Bay, Stornoway - 07017/07018 Construction, alteration or improvement of any works
Scoping Report - Deep Water Port - Glumaig Bay, Stornoway - 07017/07018 Construction, alteration or improvement of any works
Pre-Application Consultation Report - Deep Water Port - Glumaig Bay, Stornoway - 07017/07018
Scottish and Southern Electricity Networks (SSEN) - High Voltage Direct Current (HVDC) cable - Weisdale Voe to Noss Head Cable
Shetland HVDC Link - Enviromental Appraisal Cable
06906 - Exemption Direction Construction of new works
Peterhead Sea Wall Repair and Extension Construction, alteration or improvement of any works
Construction of bridge access system and walkway - Forth Rail Bridge, South Queensferry Construction, alteration or improvement of any works
Forth Rail Bridge access system and walkway - Screening Opinion Request Construction, alteration or improvement of any works
Alternative Landfall Cable Installation Method - Seagreen Alpha and Bravo Offshore Wind Farms, Firth of Forth - 07050 - Screening Opinion Renewables - Wind
Alternative Landfall Cable Installation Method - Seagreen Alpha and Bravo Offshore Wind Farms, Firth of Forth - 07050 - Screening Opinion Request Renewables - Wind
Forthwind Offshore Development - Scoping Report Renewables - Wind
Forthwind Offshore Development - Scoping Opinion Request Renewables - Wind
Goat Island, Newton Marina, Stornoway - 06826 - Screening and Scoping Report Dredging
Goat Island, Newton Marina, Stornoway - 06825 - Screening and Scoping Report Construction, alteration or improvement of any works
Dunbar East Beach - Screening Opinion
Inch Cape Offshore Windfarm - Scoping Report Renewables - Wind
Inch Cape Offshore Windfarm - Scoping Opinion Renewables - Wind
Seagreen Alpha and Bravo Offshore Windfarm – Screening Opinion Request Renewables - Wind
Lochmaddy Ferry Terminal Development - Screening Opinion Request Construction, alteration or improvement of any works
Lochmaddy Ferry Terminal Development - Screening Opinion Construction, alteration or improvement of any works
Lochmaddy Ferry Terminal Development - Scoping Report Construction, alteration or improvement of any works
Toft Pier Re-Development, Shetland - 06901/06979 - Screening Opinion Construction, alteration or improvement of any works
Rosyth International Container Terminal - Scoping Report Construction, alteration or improvement of any works
Rosyth International Container Terminal - Scoping Opinion Construction, alteration or improvement of any works
Rosyth International Container Terminal Construction, alteration or improvement of any works
NorthConnect HVDC Cable - Scoping Opinion Cable
NorthConnect HVDC Cable - Scoping Report Cable
Dales Voe - Scoping Opinion Construction, alteration or improvement of any works
Lerwick Port Authority - Proposed Dales Voe Decommisioning Base Construction, alteration or improvement of any works
Port of Leith - Scoping Request Construction, alteration or improvement of any works
Port of Leith - Scoping Opinion Construction, alteration or improvement of any works
Port of Leith Construction, alteration or improvement of any works
Port of Dundee Expansion - EIA Scoping Report and HRA Screening Report Construction, alteration or improvement of any works
Port of Dundee Expansion Construction, alteration or improvement of any works
06821 - Opinion on Report Identifying Additional Studies Cable
06821 - Report Identifying Additional Studies Cable
Extension to Marshalling Area, St Margaret’s Hope, Orkney - 06882 - Screening Opinion Construction of new works
Hunterston Marine Construction Yard Redevelopment - Hunterston, North Ayrshire Construction, alteration or improvement of any works
Hunterston Marine Construction Yard Redevelopment - Screening Opinion Request (2019) Construction, alteration or improvement of any works
Hunterston Marine Construction Yard Redevelopment - Further Information 2019 Construction, alteration or improvement of any works
Hunterston Marine Construction Yard Redevelopment - Enviromental Review 2017 Construction, alteration or improvement of any works
Hunterston Marine Construction Yard Redevelopment - Screening Opinion Request Clarification (2017) Construction, alteration or improvement of any works
Hunterston Marine Construction Yard Redevelopment - Screening Opinion Request (2017) Construction, alteration or improvement of any works
Scoping Report Construction of new works
Construction of Sea Defences – Dunbar East Beach Construction of new works
Dunbar East Beach - Outline Area Map Construction of new works
Dunbar East Beach - Method Statement Construction of new works
Dunbar East Beach - Environmental Note Construction of new works
Dunbar East Beach - Drawings Construction of new works
Dunbar East Beach - Coastal Processes Assessment Construction of new works
Dunbar East Beach - Marine Licence Application Construction of new works
Extension to Marshalling Area, St Margaret’s Hope, Orkney - 06882 - Screening Opinion Request Construction of new works
06882 – Drawings and Plans Construction of new works
06882 – Marine Licence Application Construction of new works
Tarbert Ferry Terminal Upgrade, East Loch, Tarbert, Isle of Harris - 06907/06908 - Screening Opinion Request Construction of new works
Tarbert Ferry Terminal Upgrade, East Loch, Tarbert, Isle of Harris - 06907/06908 - Screening Opinion Construction of new works
Scoping Report (August 2010) Renewables - Wind
Meteorological Mast - Inch Cape Offshore Windfarm - Screening Opinion Renewables - Wind
Replacement of Sheet Pile Wall – Former Bowling Terminal West Dumbartonshire Construction, alteration or improvement of any works
Replacement of Sheet Pile Wall – Former Bowling Terminal West Dumbartonshire – Screening Opinion Construction, alteration or improvement of any works
Installation of Sheet Pile Wall - Bowling, West Dumbarton Construction, alteration or improvement of any works
Installation of Sheet Pile Wall - Bowling, West Dumbarton Construction, alteration or improvement of any works
Pre Application Consultation Report - Ardersier Port Development Construction, alteration or improvement of any works
European Offshore Wind Deployment Centre - s.36 variation - Screening Opinion Request Renewables - Wind
European Offshore Wind Deployment Centre - s.36 variation - Screening Opinion Renewables - Wind
Forthwind Offshore Development Phase 1 - Amended Variation - Screening Opinion Renewables - Wind
Forthwind Offshore Development Phase 1 - Amended Variation - Screening Consultation Responses Renewables - Wind
Forthwind Offshore Development Phase 1 - Original Variation - Screening Opinion Request Supporting Materials Renewables - Wind
Forthwind Offshore Development Phase 1 - Amended Variation - Screening Opinion Request, Revised Consent Area Renewables - Wind
Forthwind Offshore Development Phase 1 - Amended Variation - Screening Opinion Request, Offshore Boundary Coordinates Renewables - Wind
Forthwind Offshore Development Phase 1 - Original Variation - Screening Opinion Request Renewables - Wind
Installation of Rock Armour, Helensburgh Pierhead - 06801 - Screening Report Construction of new works
Installation of Rock Armour, Helensburgh Pierhead - 06801 - Screening Opinion Construction of new works
Caithness Orkney HVDC Cable - Environmental Assessment Content Advice
Forthwind Offshore Development Phase 1 - S36 Variation Proposal and Scoping Opinion Request Renewables - Wind
Forthwind Offshore Development Phase 1 - Amended S36 Variation - Screening Opinion Request Renewables - Wind
Granton Harbour Redevelopment - Scoping Report - April 2018
Granton Harbour Redevelopment - Scoping Opinion - June 2018
Granton Harbour Redevelopment - Screening Opinion Request - November 2017
Granton Harbour Redevelopment - Screening Opinion - February 2018
Granton Harbour Redevelopment - Screening Opinion Request - August 2017
Granton Harbour Redevelopment - Screening Opinion - October 2017
Wild Seaweed Harvesting, West Coast of Scotland - Scoping Advice
Kilfinichen Pier Development, Isle of Mull - Scoping Opinion Request Construction of new works
Kilfinichen Pier Development, Isle of Mull - Scoping Opinion Construction of new works
Kilfinichen Pier Development, Isle of Mull - Pre-application Consultation (PAC) Report Construction of new works
Lochaline Ferry Terminal Berth Redevelopment, Morvern - Screening Opinion Request Construction of new works
Toft Pier Re-development, Shetland - Screening Opinion Request
Quay Improvement Works, Ardrossan Harbour - Screening Opinion Construction, alteration or improvement of any works
Quay Improvement Works, Ardrossan Harbour - Screening Opinion Request
Quay Improvement Works, Ardrossan Harbour Construction, alteration or improvement of any works
Toft Pier Re-development, Shetland - Screening Opinion Construction, alteration or improvement of any works
St. Ola Pier Redevelopment, Scrabster - Scoping opinion Construction of new works
NorthConnect HVDC Cable - Habitats Regulations Appraisal Cable
NorthConnect HVDC Cable - Pre-Application Consultation Report Cable
Lochaline Ferry Terminal Berth Redevelopment, Morvern - Screening Opinion Construction, alteration or improvement of any works
Havfrue Telecommunications Cable Cable
Havfrue Telecommunications Cable - Scoping opinion request Cable
Havfrue Telecommunications Cable - Scoping opinion Cable
Inch Cape Offshore Windfarm (Revised Design) - Scoping Opinion - Extension to Validity Renewables - Wind
Kincardine Offshore Windfarm - Pre-application Consultation Report Renewables - Wind
Kincardine Offshore Windfarm - Scoping opinion request Renewables - Wind
Kincardine Offshore Windfarm - Scoping opinion Renewables - Wind
Caithness Orkney HVDC Cable - Scoping Report Cable
Caithness Orkney HVDC Cable Cable
Beatrice Offshore Wind Farm - Transmissions Work Scoping Opinion Renewables - Wind
Beatrice Offshore Wind Farm - Scoping Report Renewables - Wind
Beatrice Offshore Wind Farm - Scoping Opinion Renewables - Wind
Moray East Offshore Windfarm - Alternative Design - Moray Firth Renewables - Wind
Moray East Offshore Windfarm - Scoping Report Renewables - Wind
Moray East Offshore Windfarm - Scoping Opinion Request Renewables - Wind
Moray East Offshore Windfarm - Scoping Opinion Renewables - Wind
Moray East Offshore Windfarm - Scoping Opinion Addendum - Ornithology Renewables - Wind
Port of Cromarty Firth - Phase 4 Development, Invergordon Service Base - Scoping opinion Construction, alteration or improvement of any works
Port of Cromarty Firth - Phase 4 Development, Invergordon Service Base - Scoping opinion request Construction, alteration or improvement of any works
Wild Seaweed Harvesting, West Coast of Scotland - Scoping opinion request Macroalgal farm
Wild Seaweed Harvesting, West Coast of Scotland Removal of any substance or object
Neart na Gaoithe Offshore Windfarm (Revised Design) - Pre-Application Consultation Public Notice Renewables - Wind
Neart na Gaoithe Offshore Windfarm (Revised Design) - Scoping Opinion Renewables - Wind
Neart na Gaoithe Offshore Windfarm (Revised Design) - Scoping Report and request for Scoping Opinion Renewables - Wind
Inch Cape Offshore Windfarm (Revised Design) - Ornithology Clarifications Renewables - Wind
Inch Cape Offshore Windfarm (Revised Design) - Post Scoping Consultation Response Renewables - Wind
Inch Cape Offshore Windfarm (Revised Design) - Impact of Suspended Sediment and Smothering on Scallops Renewables - Wind
Inch Cape Offshore Windfarm (Revised Design) - Discussion Paper on Particle Motion Renewables - Wind
Inch Cape Offshore Windfarm (Revised Design) - Salmon Migration Behaviour Report Renewables - Wind
Inch Cape Offshore Windfarm (Revised Design) - Pre-Application Consultation Public Notice Renewables - Wind
Inch Cape Offshore Windfarm (Revised Design) - Scoping Opinion Renewables - Wind
Inch Cape Offshore Windfarm (Revised Design) - Scoping Request and Report Renewables - Wind
Moray West Offshore Windfarm - Offshore Transmission Infrastructure - Scoping Report Cover Letter Renewables - Wind
Moray West Offshore Windfarm - Offshore Transmission Infrastructure - Scoping Report Renewables - Wind
Moray West Offshore Windfarm - Offshore Transmission Infrastructure - Scoping Opinion Renewables - Wind
Moray West Offshore Windfarm - Scoping Report Renewables - Wind
Moray West Offshore Windfarm - Scoping Opinion Renewables - Wind
Moray West Offshore Windfarm - Further Response to Scoping Request Renewables - Wind
Moray West Offshore Windfarm - Habitats Regulations Appraisal Screening Opinion Renewables - Wind
Moray West Offshore Windfarm - Habitats Regulations Appraisal Screening Consultation Responses Renewables - Wind
Moray West Offshore Windfarm - Pre-application consultation report Renewables - Wind
Seagreen Phase 1 Offshore Windfarm Project - Scoping Opinion Renewables - Wind
Seagreen Phase 1 Offshore Windfarm Project - Scoping Request and Report Renewables - Wind
Inch Cape Offshore Windfarm (Revised Design) - Gatecheck Report Renewables - Wind
Aberdeen Harbour Expansion - Pre-application consultation report Construction of new works
St. Ola Pier Redevelopment, Scrabster - Scoping opinion request Construction of new works
St. Ola Pier Redevelopment, Scrabster - Screening opinion Construction of new works
St. Ola Pier Redevelopment, Scrabster - Screening Opinion Request Construction of new works
Scoping Opinion - Ardersier Port Development Construction of new works
Scoping Opinion Request - Ardersier Port Development Construction of new works
Aberdeen Harbour Expansion - Pre-application consultation report Construction of new works
Hywind Scotland Pilot Park - Pre-application Consultation Renewables - Wind
European Offshore Wind Deployment Centre - Public Representations Renewables - Wind
European Offshore Wind Deployment Centre - Addendum Consultation Responses Renewables - Wind
European Offshore Wind Deployment Centre - Environmental Statement - Consultation Responses Renewables - Wind
European Offshore Wind Deployment Centre - Scoping report Renewables - Wind
European Offshore Wind Deployment Centre - Scoping opinion Renewables - Wind
Hywind Scotland Pilot Park - Public Notice Application Renewables - Wind
Hywind Scotland Pilot Park - Scoping Opinon Renewables - Wind
Hywind Scotland Pilot Park - Scoping Report Renewables - Wind
Hywind Scotland Pilot Park - Screening Opinion Renewables - Wind
West Islay Tidal Energy Park Scoping Report May 2009 Renewables - Tidal
West Islay Tidal Energy Park Scoping Opinion Renewables - Tidal